Plan-Alteration-Attribution-Standard-Instance

Rs · Resource Individual
http://proethica.org/ontology/case/173#Plan-Alteration-Attribution-Standard-Instance
Properties
Instance of
PlanAlterationAttributionStandard
http://proethica.org/ontology/intermediate#PlanAlterationAttributionStandard
Confidence
0.88
Created by
Professional engineering practice norms / state licensing board rules
Document title
Plan Alteration Attribution Standard
Importance
high
Used by
Engineer B during redesign of subdivision grading and public improvement plans
Used in context
Establishes Engineer B's obligation to clearly notate all changes made to Engineer A's plans, identify which sheets were modified, and take explicit and specific documented responsibility for each revision rather than a vague blanket note
Version
N/A — professional norm
Source Evidence
Source text
Engineer B did not note what changes were made nor did he sign any of the sheets, including the cover sheet.

Text references
Engineer B did not note what changes were made nor did he sign any of the sheets, including the cover sheet.
Engineer B placed a note on the title sheet of the public improvement plans, leaving Engineer A's signature and seal intact, stating that he, Engineer B, is taking responsibility for the 'revisions of the plans,' making no notation what those changes were.
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case173:Plan-Alteration-Attribution-Standard-Instance a proeth:PlanAlterationAttributionStandard, owl:NamedIndividual ; rdfs:label "Plan-Alteration-Attribution-Standard-Instance" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.88" ; proeth:createdby "Professional engineering practice norms / state licensing board rules" ; proeth:discoveredincase "173" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:documenttitle "Plan Alteration Attribution Standard" ; proeth:firstdiscoveredat "2026-03-01T14:15:01.899898+00:00" ; proeth:firstdiscoveredincase "173" ; proeth:generatedattime "2026-03-01T14:15:01.899898+00:00" ; proeth:importance "high" ; proeth:resourceclass "Plan Alteration Attribution Standard" ; proeth:sourcetext "Engineer B did not note what changes were made nor did he sign any of the sheets, including the cover sheet." ; proeth:textreferences "Engineer B did not note what changes were made nor did he sign any of the sheets, including the cover sheet.", "Engineer B placed a note on the title sheet of the public improvement plans, leaving Engineer A's signature and seal intact, stating that he, Engineer B, is taking responsibility for the 'revisions of the plans,' making no notation what those changes were." ; proeth:usedby "Engineer B during redesign of subdivision grading and public improvement plans" ; proeth:usedincontext "Establishes Engineer B's obligation to clearly notate all changes made to Engineer A's plans, identify which sheets were modified, and take explicit and specific documented responsibility for each revision rather than a vague blanket note" ; proeth:version "N/A — professional norm" ; proeth:wasattributedto "Case 173 Extraction" ; prov:generatedAtTime "2026-03-01T14:41:54.492388"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
173
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T14:15:01.899898+00:00
First case
173
Generated
2026-03-01T14:15:01.899898+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.492388
Generated by
ProEthica Case 173 Extraction