Document title
NSPE Code of Ethics for Engineers, Section III.9
Importance
high
Used by
Board of Ethical Review in assessing Engineer B's mixed-and-matched plan attribution
Used in context
Governs an engineer's obligation to acknowledge full design responsibility when modifications affect the integrity of the entire project; cited in connection with Engineer B's failure to take responsibility for the full redesign
Version
Current at time of case
Source Evidence
Source text
we are troubled by Engineer B's failure to acknowledge responsibility for the full design by notations on the drawings. (See Section III.9.)
Text references
We think such conduct violates Section III.9. of the Code.
we are troubled by Engineer B's failure to acknowledge responsibility for the full design by notations on the drawings. (See Section III.9.)
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case173:NSPE-Code-Section-III.9 a proeth:ProfessionalCode,
owl:NamedIndividual ;
rdfs:label "NSPE-Code-Section-III.9" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.97" ;
proeth:createdby "National Society of Professional Engineers" ;
proeth:discoveredincase "173" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:documenttitle "NSPE Code of Ethics for Engineers, Section III.9" ;
proeth:firstdiscoveredat "2026-03-01T14:16:22.030716+00:00" ;
proeth:firstdiscoveredincase "173" ;
proeth:generatedattime "2026-03-01T14:16:22.030716+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Professional Code" ;
proeth:sourcetext "we are troubled by Engineer B's failure to acknowledge responsibility for the full design by notations on the drawings. (See Section III.9.)" ;
proeth:textreferences "We think such conduct violates Section III.9. of the Code.",
"we are troubled by Engineer B's failure to acknowledge responsibility for the full design by notations on the drawings. (See Section III.9.)" ;
proeth:usedby "Board of Ethical Review in assessing Engineer B's mixed-and-matched plan attribution" ;
proeth:usedincontext "Governs an engineer's obligation to acknowledge full design responsibility when modifications affect the integrity of the entire project; cited in connection with Engineer B's failure to take responsibility for the full redesign" ;
proeth:version "Current at time of case" ;
proeth:wasattributedto "Case 173 Extraction" ;
prov:generatedAtTime "2026-03-01T14:41:54.496472"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Extraction details
Discovered in case
173
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-03-01T14:16:22.030716+00:00
First case
173
Generated
2026-03-01T14:16:22.030716+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.496472
Generated by
ProEthica Case 173 Extraction