Inter-Engineer Communication Absent — Engineer B Modifying Engineer A's Plans

S · State Individual
http://proethica.org/ontology/case/173#Inter-Engineer_Communication_Absent_—_Engineer_B_Modifying_Engineer_As_Plans
Properties
Instance of
Inter-EngineerCommunicationAbsentDuringActiveRedesignState
http://proethica.org/ontology/intermediate#Inter-EngineerCommunicationAbsentDuringActiveRedesignState
Active period
From the time Engineer B received Engineer A's plans through completion of the redesign
Affected parties
Client
Engineer A
Engineer B
Confidence
0.93
Importance
high
Subject
Absence of any communication between Engineer B and Engineer A during Engineer B's redesign of Engineer A's sealed plans
Terminated by
Not terminated — no communication occurred
Triggering event
Engineer B's commencement of modifications to Engineer A's sealed plans without any notification or consultation
Urgency level
medium
Source Evidence
Source text
it would have been wiser and more professional for Engineer B to consult with Engineer A before undertaking to modify the plans prepared by Engineer A

Text references
it would have been wiser and more professional for Engineer B to consult with Engineer A before undertaking to modify the plans prepared by Engineer A
the purpose of Section 12(a) (now Section III.8.a.) is to provide the engineer whose work is being reviewed by another engineer an opportunity to submit ... comments or explanations for... technical decision
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . <http://proethica.org/ontology/case/173#Inter-Engineer_Communication_Absent_—_Engineer_B_Modifying_Engineer_As_Plans> a proeth:Inter-EngineerCommunicationAbsentDuringActiveRedesignState, owl:NamedIndividual ; rdfs:label "Inter-Engineer Communication Absent — Engineer B Modifying Engineer A's Plans" ; proeth:activeperiod "From the time Engineer B received Engineer A's plans through completion of the redesign" ; proeth:affectedparties "Client", "Engineer A", "Engineer B" ; proeth:conceptCategory "State" ; proeth:confidence "0.93" ; proeth:discoveredincase "173" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-03-01T14:17:17.434245+00:00" ; proeth:firstdiscoveredincase "173" ; proeth:generatedattime "2026-03-01T14:17:17.434245+00:00" ; proeth:importance "high" ; proeth:sourcetext "it would have been wiser and more professional for Engineer B to consult with Engineer A before undertaking to modify the plans prepared by Engineer A" ; proeth:stateclass "Inter-Engineer Communication Absent During Active Redesign State" ; proeth:subject "Absence of any communication between Engineer B and Engineer A during Engineer B's redesign of Engineer A's sealed plans" ; proeth:terminatedby "Not terminated — no communication occurred" ; proeth:textreferences "it would have been wiser and more professional for Engineer B to consult with Engineer A before undertaking to modify the plans prepared by Engineer A", "the purpose of Section 12(a) (now Section III.8.a.) is to provide the engineer whose work is being reviewed by another engineer an opportunity to submit ... comments or explanations for... technical decision" ; proeth:triggeringevent "Engineer B's commencement of modifications to Engineer A's sealed plans without any notification or consultation" ; proeth:urgencylevel "medium" ; proeth:wasattributedto "Case 173 Extraction" ; prov:generatedAtTime "2026-03-01T14:41:54.498537"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
173
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-03-01T14:17:17.434245+00:00
First case
173
Generated
2026-03-01T14:17:17.434245+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.498537
Generated by
ProEthica Case 173 Extraction