Engineer B Undocumented Redesign on Engineer A Plans

S · State Individual
http://proethica.org/ontology/case/173#Engineer_B_Undocumented_Redesign_on_Engineer_A_Plans
Properties
Instance of
SuccessorEngineerUndocumentedRedesignonPredecessorPlansState
http://proethica.org/ontology/intermediate#SuccessorEngineerUndocumentedRedesignonPredecessorPlansState
Active period
From Engineer B's retention by the client through completion of the redesign work
Affected parties
Client
Engineer A
Engineer B
Public
Confidence
0.95
Importance
high
Subject
Engineer B's redesign engagement across both the grading and public improvement plan sets
Terminated by
Not yet terminated in terms of ethical consequences; the undocumented redesign is complete and the plans are in use
Triggering event
Client retaining Engineer B to review and redesign the project using Engineer A's plans as a guide, with Engineer B proceeding to make substantial changes without documentation, signing, or communication
Urgency level
high
Source Evidence
Source text
Engineer B was later retained by the client to review and redesign the project

Text references
At no time after Engineer B was retained were there any communications between the two engineers
Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans
Engineer B did not note what changes were made nor did he sign any of the sheets, including the cover sheet
Engineer B reviewed the original drawings, made changes on the grading plans, including deletion of one sheet, raising the elevation of the housing pads and changing routing of the street
Engineer B was later retained by the client to review and redesign the project
He made no notation of the changes, did not sign the plans, and left Engineer A's seal and signature intact
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case173:Engineer_B_Undocumented_Redesign_on_Engineer_A_Plans a proeth:SuccessorEngineerUndocumentedRedesignonPredecessorPlansState, owl:NamedIndividual ; rdfs:label "Engineer B Undocumented Redesign on Engineer A Plans" ; proeth:activeperiod "From Engineer B's retention by the client through completion of the redesign work" ; proeth:affectedparties "Client", "Engineer A", "Engineer B", "Public" ; proeth:conceptCategory "State" ; proeth:confidence "0.95" ; proeth:discoveredincase "173" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T14:15:44.209156+00:00" ; proeth:firstdiscoveredincase "173" ; proeth:generatedattime "2026-03-01T14:15:44.209156+00:00" ; proeth:importance "high" ; proeth:sourcetext "Engineer B was later retained by the client to review and redesign the project" ; proeth:stateclass "Successor Engineer Undocumented Redesign on Predecessor Plans State" ; proeth:subject "Engineer B's redesign engagement across both the grading and public improvement plan sets" ; proeth:terminatedby "Not yet terminated in terms of ethical consequences; the undocumented redesign is complete and the plans are in use" ; proeth:textreferences "At no time after Engineer B was retained were there any communications between the two engineers", "Engineer B also made major design changes to the storm drains, pipe dimensions, sewers, and utilities in the public improvement plans", "Engineer B did not note what changes were made nor did he sign any of the sheets, including the cover sheet", "Engineer B reviewed the original drawings, made changes on the grading plans, including deletion of one sheet, raising the elevation of the housing pads and changing routing of the street", "Engineer B was later retained by the client to review and redesign the project", "He made no notation of the changes, did not sign the plans, and left Engineer A's seal and signature intact" ; proeth:triggeringevent "Client retaining Engineer B to review and redesign the project using Engineer A's plans as a guide, with Engineer B proceeding to make substantial changes without documentation, signing, or communication" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 173 Extraction" ; prov:generatedAtTime "2026-03-01T14:41:54.494762"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
173
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T14:15:44.209156+00:00
First case
173
Generated
2026-03-01T14:15:44.209156+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.494762
Generated by
ProEthica Case 173 Extraction