Absence of Communication Between Engineer A and Engineer B During Redesign
S · State
Individual
http://proethica.org/ontology/case/173#Absence_of_Communication_Between_Engineer_A_and_Engineer_B_During_Redesign
Properties
Instance of
Inter-EngineerCommunicationAbsentDuringActiveRedesignState
http://proethica.org/ontology/intermediate#Inter-EngineerCommunicationAbsentDuringActiveRedesignState
Active period
From Engineer B's retention by the client through completion of the redesign; no communication occurred at any point
Affected parties
Engineer A
Engineer B
Confidence
0.9
Importance
high
Subject
The professional relationship (or lack thereof) between Engineer A and Engineer B throughout the redesign engagement
Terminated by
Not terminated during the described period; the case states no communications occurred at any time after Engineer B was retained
Triggering event
Engineer B being retained to redesign Engineer A's sealed plans without any notification to or communication with Engineer A
Urgency level
medium
Source Evidence
Source text
At no time after Engineer B was retained were there any communications between the two engineers
Text references
At no time after Engineer B was retained were there any communications between the two engineers
TTL
@prefix case173: <http://proethica.org/ontology/case/173#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case173:Absence_of_Communication_Between_Engineer_A_and_Engineer_B_During_Redesign a proeth:Inter-EngineerCommunicationAbsentDuringActiveRedesignState,
owl:NamedIndividual ;
rdfs:label "Absence of Communication Between Engineer A and Engineer B During Redesign" ;
proeth:activeperiod "From Engineer B's retention by the client through completion of the redesign; no communication occurred at any point" ;
proeth:affectedparties "Engineer A",
"Engineer B" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.9" ;
proeth:discoveredincase "173" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T14:15:44.209156+00:00" ;
proeth:firstdiscoveredincase "173" ;
proeth:generatedattime "2026-03-01T14:15:44.209156+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "At no time after Engineer B was retained were there any communications between the two engineers" ;
proeth:stateclass "Inter-Engineer Communication Absent During Active Redesign State" ;
proeth:subject "The professional relationship (or lack thereof) between Engineer A and Engineer B throughout the redesign engagement" ;
proeth:terminatedby "Not terminated during the described period; the case states no communications occurred at any time after Engineer B was retained" ;
proeth:textreferences "At no time after Engineer B was retained were there any communications between the two engineers" ;
proeth:triggeringevent "Engineer B being retained to redesign Engineer A's sealed plans without any notification to or communication with Engineer A" ;
proeth:urgencylevel "medium" ;
proeth:wasattributedto "Case 173 Extraction" ;
prov:generatedAtTime "2026-03-01T14:41:54.495348"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 173 Extraction" .
Metadata
Extraction details
Discovered in case
173
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T14:15:44.209156+00:00
First case
173
Generated
2026-03-01T14:15:44.209156+00:00
Attributed to
Case 173 Extraction
Generated
2026-03-01T14:41:54.495348
Generated by
ProEthica Case 173 Extraction