Document title
BER Case 82-6: Engineer Retained by Government Accepting Engagement from Adverse Contractor
Importance
high
Used by
NSPE Board of Ethical Review
Used in context
Precedent establishing that an engineer retained by the U.S. government to study a dam failure cannot ethically agree to represent the contractor (adverse party) in a claim against the government without former client consent; directly analogous to Engineer A switching from plaintiff to defendant representation
Version
1982
Source Evidence
Source text
in BER Case 82-6, this Board ruled that where an engineer is retained by the U.S. government to study the causes of a dam failure, it would be unethical for the engineer to agree to be retained by the contractor involved in the construction of the dam

Text references
in BER Case 82-6, this Board ruled that where an engineer is retained by the U.S. government to study the causes of a dam failure, it would be unethical for the engineer to agree to be retained by the contractor involved in the construction of the dam
TTL
@prefix case172: <http://proethica.org/ontology/case/172#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case172:BER-Case-82-6 a proeth:BERCasePrecedent, owl:NamedIndividual ; rdfs:label "BER-Case-82-6" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.98" ; proeth:createdby "NSPE Board of Ethical Review" ; proeth:discoveredincase "172" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:documenttitle "BER Case 82-6: Engineer Retained by Government Accepting Engagement from Adverse Contractor" ; proeth:firstdiscoveredat "2026-03-01T18:08:08.354357+00:00" ; proeth:firstdiscoveredincase "172" ; proeth:generatedattime "2026-03-01T18:08:08.354357+00:00" ; proeth:importance "high" ; proeth:resourceclass "BER Case Precedent" ; proeth:sourcetext "in BER Case 82-6, this Board ruled that where an engineer is retained by the U.S. government to study the causes of a dam failure, it would be unethical for the engineer to agree to be retained by the contractor involved in the construction of the dam" ; proeth:textreferences "in BER Case 82-6, this Board ruled that where an engineer is retained by the U.S. government to study the causes of a dam failure, it would be unethical for the engineer to agree to be retained by the contractor involved in the construction of the dam" ; proeth:usedby "NSPE Board of Ethical Review" ; proeth:usedincontext "Precedent establishing that an engineer retained by the U.S. government to study a dam failure cannot ethically agree to represent the contractor (adverse party) in a claim against the government without former client consent; directly analogous to Engineer A switching from plaintiff to defendant representation" ; proeth:version "1982" ; proeth:wasattributedto "Case 172 Extraction" ; prov:generatedAtTime "2026-03-01T18:28:40.762684"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 172 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
172
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-03-01T18:08:08.354357+00:00
First case
172
Generated
2026-03-01T18:08:08.354357+00:00
Attributed to
Case 172 Extraction
Generated
2026-03-01T18:28:40.762684
Generated by
ProEthica Case 172 Extraction