Engineer B Post-Occupancy Inspection Honest Adverse Finding Plumbing Heating Report
O · Obligation
Individual
http://proethica.org/ontology/case/169#Engineer_B_Post-Occupancy_Inspection_Honest_Adverse_Finding_Plumbing_Heating_Report
Properties
Instance of
Post-OccupancyInspectionHonestAdverseFindingNon-SuppressionObligation
http://proethica.org/ontology/intermediate#Post-OccupancyInspectionHonestAdverseFindingNon-SuppressionObligation
Case context
After the joint wiring inspection revealed no defects, the owner advised Engineer B of complaints about plumbing and heating systems; Engineer B conducted further study and issued a report finding no plumbing problem but identifying heating equipment sizing inadequacies.
Compliance status
met
Confidence
0.92
Importance
high
Obligated party
Engineer B
Obligation statement
Engineer B was obligated to report all material findings honestly and completely to the new owner, including the conclusion that there were design inadequacies in the original sizing of hot water and heating equipment, without suppressing adverse findings out of collegial deference to Engineer A.
Temporal scope
Upon completion of further study of plumbing and heating systems
Source Evidence
Source text
Engineer B thereafter conducted a further study and filed a report with the owner.
Text references
Engineer B recommended the installation of equipment of higher capacity.
Engineer B thereafter conducted a further study and filed a report with the owner.
The report noted there was no problem with the design of the plumbing system, but concluded there were design inadequacies in the original sizing of the equipment for hot water and heating.
TTL
@prefix case169: <http://proethica.org/ontology/case/169#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case169:Engineer_B_Post-Occupancy_Inspection_Honest_Adverse_Finding_Plumbing_Heating_Report a proeth:Post-OccupancyInspectionHonestAdverseFindingNon-SuppressionObligation,
owl:NamedIndividual ;
rdfs:label "Engineer B Post-Occupancy Inspection Honest Adverse Finding Plumbing Heating Report" ;
proeth-core:competesWith case169:Engineer_B_Objective_and_Complete_Reporting_Balanced_Findings ;
proeth-core:defeasibleUnder case169:Engineer_B_Competitive_Self-Interest_Contamination_Risk_in_Criticism,
case169:Engineer_B_Report_Alleging_Design_Inadequacies_in_Heating_Equipment_Sizing ;
proeth:casecontext "After the joint wiring inspection revealed no defects, the owner advised Engineer B of complaints about plumbing and heating systems; Engineer B conducted further study and issued a report finding no plumbing problem but identifying heating equipment sizing inadequacies." ;
proeth:compliancestatus "met" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.92" ;
proeth:derivedFromPrinciple case169:Honest_Disagreement_Among_Qualified_Engineers_Permissibility_Applied_to_Engineer_B_Adverse_Findings ;
proeth:discoveredincase "169" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T22:19:17.209429+00:00" ;
proeth:firstdiscoveredincase "169" ;
proeth:generatedattime "2026-03-01T22:19:17.209429+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer B" ;
proeth:obligationclass "Post-Occupancy Inspection Honest Adverse Finding Non-Suppression Obligation" ;
proeth:obligationstatement "Engineer B was obligated to report all material findings honestly and completely to the new owner, including the conclusion that there were design inadequacies in the original sizing of hot water and heating equipment, without suppressing adverse findings out of collegial deference to Engineer A." ;
proeth:sourcetext "Engineer B thereafter conducted a further study and filed a report with the owner." ;
proeth:temporalscope "Upon completion of further study of plumbing and heating systems" ;
proeth:textreferences "Engineer B recommended the installation of equipment of higher capacity.",
"Engineer B thereafter conducted a further study and filed a report with the owner.",
"The report noted there was no problem with the design of the plumbing system, but concluded there were design inadequacies in the original sizing of the equipment for hot water and heating." ;
proeth:wasattributedto "Case 169 Extraction" ;
prov:generatedAtTime "2026-03-01T22:36:17.042236"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 169 Extraction" .
Metadata
Extraction details
Discovered in case
169
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T22:19:17.209429+00:00
First case
169
Generated
2026-03-01T22:19:17.209429+00:00
Attributed to
Case 169 Extraction
Generated
2026-03-01T22:36:17.042236
Generated by
ProEthica Case 169 Extraction