Available Evidence Consultation Satisfied By Joint Wiring Inspection
P · Principle
Individual
http://proethica.org/ontology/case/169#Available_Evidence_Consultation_Satisfied_By_Joint_Wiring_Inspection
Properties
Instance of
AvailableEvidenceConsultationBeforeAdverseForensicOpinion
http://proethica.org/ontology/intermediate#AvailableEvidenceConsultationBeforeAdverseForensicOpinion
Applied to
Plumbing and heating system assessment
Wiring inspection findings
Balancing with
Client interest in expeditious reporting
Engineer A's right to participate in review of his own work
Concrete expression
Engineer B participated in a joint inspection of the wiring with Engineer A and the city wiring inspector before issuing findings, and conducted a further study of the plumbing and heating systems — demonstrating reasonable evidence consultation before rendering adverse technical opinions
Confidence
0.88
Importance
medium
Interpretation
The joint wiring inspection gave Engineer A direct participation in the evidence-gathering process for that system; the further study of plumbing and heating demonstrates diligent evidence review before adverse conclusions were drawn
Invoked by
Engineer B Post-Occupancy Facility Inspection Engineer
Tension resolution
The available evidence consultation principle is satisfied: Engineer B conducted a joint inspection with Engineer A for the wiring system and a further independent study for the plumbing and heating systems before issuing findings
Source Evidence
Source text
At the owner's request, a joint inspection of the wiring was made by the two engineers and the city wiring inspector.
Text references
At the owner's request, a joint inspection of the wiring was made by the two engineers and the city wiring inspector.
Engineer B thereafter conducted a further study and filed a report with the owner.
The inspection did not reveal any defects in the wiring.
TTL
@prefix case169: <http://proethica.org/ontology/case/169#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case169:Available_Evidence_Consultation_Satisfied_By_Joint_Wiring_Inspection a proeth:AvailableEvidenceConsultationBeforeAdverseForensicOpinion,
owl:NamedIndividual ;
rdfs:label "Available Evidence Consultation Satisfied By Joint Wiring Inspection" ;
proeth:appliedto "Plumbing and heating system assessment",
"Wiring inspection findings" ;
proeth:balancingwith "Client interest in expeditious reporting",
"Engineer A's right to participate in review of his own work" ;
proeth:conceptCategory "Principle" ;
proeth:concreteexpression "Engineer B participated in a joint inspection of the wiring with Engineer A and the city wiring inspector before issuing findings, and conducted a further study of the plumbing and heating systems — demonstrating reasonable evidence consultation before rendering adverse technical opinions" ;
proeth:confidence "0.88" ;
proeth:discoveredincase "169" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T22:17:13.415521+00:00" ;
proeth:firstdiscoveredincase "169" ;
proeth:generatedattime "2026-03-01T22:17:13.415521+00:00" ;
proeth:importance "medium" ;
proeth:interpretation "The joint wiring inspection gave Engineer A direct participation in the evidence-gathering process for that system; the further study of plumbing and heating demonstrates diligent evidence review before adverse conclusions were drawn" ;
proeth:invokedby "Engineer B Post-Occupancy Facility Inspection Engineer" ;
proeth:principleclass "Available Evidence Consultation Before Adverse Forensic Opinion" ;
proeth:sourcetext "At the owner's request, a joint inspection of the wiring was made by the two engineers and the city wiring inspector." ;
proeth:tensionresolution "The available evidence consultation principle is satisfied: Engineer B conducted a joint inspection with Engineer A for the wiring system and a further independent study for the plumbing and heating systems before issuing findings" ;
proeth:textreferences "At the owner's request, a joint inspection of the wiring was made by the two engineers and the city wiring inspector.",
"Engineer B thereafter conducted a further study and filed a report with the owner.",
"The inspection did not reveal any defects in the wiring." ;
proeth:wasattributedto "Case 169 Extraction" ;
prov:generatedAtTime "2026-03-01T22:36:17.041764"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 169 Extraction" .
Metadata
Extraction details
Discovered in case
169
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T22:17:13.415521+00:00
First case
169
Generated
2026-03-01T22:17:13.415521+00:00
Attributed to
Case 169 Extraction
Generated
2026-03-01T22:36:17.041764
Generated by
ProEthica Case 169 Extraction