General Supervision Without Detailed Design Review — Engineer A (Discussion Elaboration)

S · State Individual
http://proethica.org/ontology/case/163#General_Supervision_Without_Detailed_Design_Review_—_Engineer_A_Discussion_Elaboration
Properties
Instance of
GeneralSupervisionWithoutDetailedDesignReviewState
http://proethica.org/ontology/intermediate#GeneralSupervisionWithoutDetailedDesignReviewState
Active period
Duration of projects where Engineer A relied on confidence in subordinates rather than personal verification
Affected parties
Clients
Engineer A
Public
Subordinate engineers
Confidence
0.89
Importance
high
Subject
Engineer A's supervisory engagement pattern — establishing design concepts, reviewing progress elements, answering technical questions — without conducting sufficiently detailed review of each document before sealing
Terminated by
Engineer A adopting practices that satisfy the Board's clarified standard for responsible charge
Triggering event
Engineer A's adoption of a high-level managerial approach to responsible charge in a large firm context
Urgency level
high
Source Evidence
Source text
the chief engineer should be involved at the outset of the project in the establishment of the design concept and the design requirements, as well as in the review of the various elements of the design or project status as the project develops

Text references
the chief engineer should be involved at the outset of the project in the establishment of the design concept and the design requirements, as well as in the review of the various elements of the design or project status as the project develops
the conduct of the engineer in the preparation of the plans and drawings involves the professional judgment and discretion of the engineer
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . <http://proethica.org/ontology/case/163#General_Supervision_Without_Detailed_Design_Review_—_Engineer_A_Discussion_Elaboration> a proeth:GeneralSupervisionWithoutDetailedDesignReviewState, owl:NamedIndividual ; rdfs:label "General Supervision Without Detailed Design Review — Engineer A (Discussion Elaboration)" ; proeth:activeperiod "Duration of projects where Engineer A relied on confidence in subordinates rather than personal verification" ; proeth:affectedparties "Clients", "Engineer A", "Public", "Subordinate engineers" ; proeth:conceptCategory "State" ; proeth:confidence "0.89" ; proeth:discoveredincase "163" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-03-01T14:16:44.105621+00:00" ; proeth:firstdiscoveredincase "163" ; proeth:generatedattime "2026-03-01T14:16:44.105621+00:00" ; proeth:importance "high" ; proeth:sourcetext "the chief engineer should be involved at the outset of the project in the establishment of the design concept and the design requirements, as well as in the review of the various elements of the design or project status as the project develops" ; proeth:stateclass "General Supervision Without Detailed Design Review State" ; proeth:subject "Engineer A's supervisory engagement pattern — establishing design concepts, reviewing progress elements, answering technical questions — without conducting sufficiently detailed review of each document before sealing" ; proeth:terminatedby "Engineer A adopting practices that satisfy the Board's clarified standard for responsible charge" ; proeth:textreferences "the chief engineer should be involved at the outset of the project in the establishment of the design concept and the design requirements, as well as in the review of the various elements of the design or project status as the project develops", "the conduct of the engineer in the preparation of the plans and drawings involves the professional judgment and discretion of the engineer" ; proeth:triggeringevent "Engineer A's adoption of a high-level managerial approach to responsible charge in a large firm context" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 163 Extraction" ; prov:generatedAtTime "2026-03-01T14:34:52.541028"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 163 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
163
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-03-01T14:16:44.105621+00:00
First case
163
Generated
2026-03-01T14:16:44.105621+00:00
Attributed to
Case 163 Extraction
Generated
2026-03-01T14:34:52.541028
Generated by
ProEthica Case 163 Extraction