Engineer A Responsible Charge Active Review Obligation Violation
O · Obligation
Individual
http://proethica.org/ontology/case/163#Engineer_A_Responsible_Charge_Active_Review_Obligation_Violation
Properties
Instance of
ResponsibleChargeActiveReviewObligation
http://proethica.org/ontology/intermediate#ResponsibleChargeActiveReviewObligation
Case context
Engineer A's general direction and supervision — limited to concept establishment, design requirements, progress reviews, and technical Q&A — does not constitute the active, substantive review required under responsible charge before sealing.
Compliance status
unmet
Confidence
0.94
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A was obligated, as the engineer bearing statutory responsible charge over plans prepared by subordinate registered and non-registered engineers, to conduct an active, substantive, and technically adequate review of all deliverables sufficient to identify errors, omissions, and regulatory non-compliance before applying his professional seal.
Temporal scope
Prior to each act of sealing subordinate-prepared engineering plans
Relationships
defeasibleUnder
Engineer A General Supervision Without Detailed Design Review
Source Evidence
Source text
Engineer A finds it impossible to give a detailed review or check of the design.
Text references
By general direction and supervision, Engineer A means that he is involved in helping to establish the concept, the design requirements, and review elements of the design or project status as the design progresses.
Engineer A finds it impossible to give a detailed review or check of the design.
TTL
@prefix case163: <http://proethica.org/ontology/case/163#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case163:Engineer_A_Responsible_Charge_Active_Review_Obligation_Violation a proeth:ResponsibleChargeActiveReviewObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Responsible Charge Active Review Obligation Violation" ;
proeth-core:competesWith case163:Engineer_A_Organizational_Scale_Non-Excuse_Responsible_Charge_Sealing ;
proeth-core:defeasibleUnder case163:Engineer_A_General_Supervision_Without_Detailed_Design_Review ;
proeth-core:prevailsOver case163:Engineer_A_General_Direction_Non-Equivalence_to_Responsible_Charge_Violation ;
proeth:casecontext "Engineer A's general direction and supervision — limited to concept establishment, design requirements, progress reviews, and technical Q&A — does not constitute the active, substantive review required under responsible charge before sealing." ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.94" ;
proeth:derivedFromPrinciple case163:Public_Welfare_Paramount_Invoked_by_Engineer_A_Sealing_Without_Adequate_Review,
case163:Responsible_Charge_Direction_and_Control_Definition_Applied_to_Chief_Engineer_Sealing,
case163:Responsible_Charge_Engagement_Standard_Applied_to_Engineer_A_General_Supervision ;
proeth:discoveredincase "163" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T14:19:56.596848+00:00" ;
proeth:firstdiscoveredincase "163" ;
proeth:generatedattime "2026-03-01T14:19:56.596848+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Responsible Charge Active Review Obligation" ;
proeth:obligationstatement "Engineer A was obligated, as the engineer bearing statutory responsible charge over plans prepared by subordinate registered and non-registered engineers, to conduct an active, substantive, and technically adequate review of all deliverables sufficient to identify errors, omissions, and regulatory non-compliance before applying his professional seal." ;
proeth:sourcetext "Engineer A finds it impossible to give a detailed review or check of the design." ;
proeth:temporalscope "Prior to each act of sealing subordinate-prepared engineering plans" ;
proeth:textreferences "By general direction and supervision, Engineer A means that he is involved in helping to establish the concept, the design requirements, and review elements of the design or project status as the design progresses.",
"Engineer A finds it impossible to give a detailed review or check of the design." ;
proeth:wasattributedto "Case 163 Extraction" ;
prov:generatedAtTime "2026-03-01T14:34:52.832567"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 163 Extraction" .
Metadata
Extraction details
Discovered in case
163
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T14:19:56.596848+00:00
First case
163
Generated
2026-03-01T14:19:56.596848+00:00
Attributed to
Case 163 Extraction
Generated
2026-03-01T14:34:52.832567
Generated by
ProEthica Case 163 Extraction