Engineer B Structural Failure Harm Materialized

S · State Individual
http://proethica.org/ontology/case/16#Engineer_B_Structural_Failure_Harm_Materialized
Properties
Instance of
StructuralFailureHarmMaterializedState
http://proethica.org/ontology/intermediate#StructuralFailureHarmMaterializedState
Active period
From the moment of structural failure through the redesign and remediation process
Affected parties
Contractor
Engineer A
Engineer B
Public
Confidence
0.95
Importance
high
Subject
Physical structural failure of Engineer A's office building basement during construction, confirming that design errors caused actual harm
Terminated by
Engineer R's complete redesign of the structure
Triggering event
Significant structural failure during basement construction, attributed to Engineer B's deficient design
Urgency level
high
Source Evidence
Source text
Early during the process of constructing the basement there was a significant structural failure

Text references
Early during the process of constructing the basement there was a significant structural failure
Engineer A noticed what he believed was 'odd' structural bracing and other questionable structural details
Engineer R's review revealed a surprising number of serious structural design errors, omissions, and faulty details
TTL
@prefix case16: <http://proethica.org/ontology/case/16#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case16:Engineer_B_Structural_Failure_Harm_Materialized a proeth:StructuralFailureHarmMaterializedState, owl:NamedIndividual ; rdfs:label "Engineer B Structural Failure Harm Materialized" ; proeth:activeperiod "From the moment of structural failure through the redesign and remediation process" ; proeth:affectedparties "Contractor", "Engineer A", "Engineer B", "Public" ; proeth:conceptCategory "State" ; proeth:confidence "0.95" ; proeth:discoveredincase "16" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-25T04:09:06.505557+00:00" ; proeth:firstdiscoveredincase "16" ; proeth:generatedattime "2026-02-25T04:09:06.505557+00:00" ; proeth:importance "high" ; proeth:sourcetext "Early during the process of constructing the basement there was a significant structural failure" ; proeth:stateclass "Structural Failure Harm Materialized State" ; proeth:subject "Physical structural failure of Engineer A's office building basement during construction, confirming that design errors caused actual harm" ; proeth:terminatedby "Engineer R's complete redesign of the structure" ; proeth:textreferences "Early during the process of constructing the basement there was a significant structural failure", "Engineer A noticed what he believed was 'odd' structural bracing and other questionable structural details", "Engineer R's review revealed a surprising number of serious structural design errors, omissions, and faulty details" ; proeth:triggeringevent "Significant structural failure during basement construction, attributed to Engineer B's deficient design" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 16 Extraction" ; prov:generatedAtTime "2026-02-25T12:12:21.720397"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 16 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 23:35
Discovered in case
16
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-25T04:09:06.505557+00:00
First case
16
Generated
2026-02-25T04:09:06.505557+00:00
Attributed to
Case 16 Extraction
Generated
2026-02-25T12:12:21.720397
Generated by
ProEthica Case 16 Extraction