Non-Engineer-Supervisor-Authority-Limitation-Instance
Rs · Resource
Individual
http://proethica.org/ontology/case/157#Non-Engineer-Supervisor-Authority-Limitation-Instance
Properties
Instance of
Non-EngineerSupervisorAuthorityLimitationStandard
http://proethica.org/ontology/intermediate#Non-EngineerSupervisorAuthorityLimitationStandard
Confidence
0.8
Created by
NSPE professional ethics framework
Document title
Non-Engineer Supervisor Authority Limitation Standard
Importance
high
Used by
NSPE BER in evaluating management's rejection of Engineer A's professional recommendations
Used in context
Addresses the limits of management authority to override Engineer A's professional technical assessments of subcontractor submissions, particularly where management lacks the technical basis to reject Engineer A's findings
Version
N/A
Source Evidence
Source text
Management rejected the comments of Engineer A, particularly his proposal that the work of a particular subcontractor be redesigned because of Engineer A's claim that the subcontractor's submission represented excessive cost and time delays.
Text references
Management rejected the comments of Engineer A, particularly his proposal that the work of a particular subcontractor be redesigned because of Engineer A's claim that the subcontractor's submission represented excessive cost and time delays.
TTL
@prefix case157: <http://proethica.org/ontology/case/157#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case157:Non-Engineer-Supervisor-Authority-Limitation-Instance a proeth:Non-EngineerSupervisorAuthorityLimitationStandard,
owl:NamedIndividual ;
rdfs:label "Non-Engineer-Supervisor-Authority-Limitation-Instance" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.8" ;
proeth:createdby "NSPE professional ethics framework" ;
proeth:discoveredincase "157" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:documenttitle "Non-Engineer Supervisor Authority Limitation Standard" ;
proeth:firstdiscoveredat "2026-03-01T19:18:21.015874+00:00" ;
proeth:firstdiscoveredincase "157" ;
proeth:generatedattime "2026-03-01T19:18:21.015874+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Non-Engineer Supervisor Authority Limitation Standard" ;
proeth:sourcetext "Management rejected the comments of Engineer A, particularly his proposal that the work of a particular subcontractor be redesigned because of Engineer A's claim that the subcontractor's submission represented excessive cost and time delays." ;
proeth:textreferences "Management rejected the comments of Engineer A, particularly his proposal that the work of a particular subcontractor be redesigned because of Engineer A's claim that the subcontractor's submission represented excessive cost and time delays." ;
proeth:usedby "NSPE BER in evaluating management's rejection of Engineer A's professional recommendations" ;
proeth:usedincontext "Addresses the limits of management authority to override Engineer A's professional technical assessments of subcontractor submissions, particularly where management lacks the technical basis to reject Engineer A's findings" ;
proeth:version "N/A" ;
proeth:wasattributedto "Case 157 Extraction" ;
prov:generatedAtTime "2026-03-01T19:40:53.881030"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 157 Extraction" .
Metadata
Extraction details
Discovered in case
157
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T19:18:21.015874+00:00
First case
157
Generated
2026-03-01T19:18:21.015874+00:00
Attributed to
Case 157 Extraction
Generated
2026-03-01T19:40:53.881030
Generated by
ProEthica Case 157 Extraction