Proportional Escalation Obligation BER 07-10 Measured Response
P · Principle
Individual
http://proethica.org/ontology/case/140#Proportional_Escalation_Obligation_BER_07-10_Measured_Response
Properties
Instance of
ProportionalEscalationObligationCalibratedtoImminenceandBreadthofRisk
http://proethica.org/ontology/intermediate#ProportionalEscalationObligationCalibratedtoImminenceandBreadthofRisk
Applied to
Barn structural modification risk
Written notification to owner and town supervisor
Balancing with
Public Welfare Paramount
Written Documentation Requirement for Safety Notification
Concrete expression
The BER 07-10 barn structural risk — significant but not imminent, affecting one property — required a measured escalation: written notification to owner and supervisor, followed by deadline-setting and escalation to county/state building officials only if no action was taken
Confidence
0.93
Importance
high
Interpretation
The non-imminent and limited scope of the barn structural risk permitted a graduated response with deadlines rather than immediate multi-authority escalation
Invoked by
Engineer A BER 07-10 Prior Design Engineer Barn
Tension resolution
The measured nature of the risk permitted a graduated escalation with deadlines before escalating to county/state building officials
Source Evidence
Source text
Engineer A had fulfilled his ethical obligation by notifying the town supervisor, but that Engineer A should also notify the new owner in writing of the perceived deficiency
Text references
Engineer A had fulfilled his ethical obligation by notifying the town supervisor, but that Engineer A should also notify the new owner in writing of the perceived deficiency
If appropriate steps were not taken within a reasonable period of time, Engineer A should have again contact the town supervisor in writing and indicate that if steps are not taken within a specific period of time to adequately address the situation, Engineer A will be required to bring the matter to the attention of county or state building officials, as appropriate
TTL
@prefix case140: <http://proethica.org/ontology/case/140#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case140:Proportional_Escalation_Obligation_BER_07-10_Measured_Response a proeth:ProportionalEscalationObligationCalibratedtoImminenceandBreadthofRisk,
owl:NamedIndividual ;
rdfs:label "Proportional Escalation Obligation BER 07-10 Measured Response" ;
proeth:appliedto "Barn structural modification risk",
"Written notification to owner and town supervisor" ;
proeth:balancingwith "Public Welfare Paramount",
"Written Documentation Requirement for Safety Notification" ;
proeth:conceptCategory "Principle" ;
proeth:concreteexpression "The BER 07-10 barn structural risk — significant but not imminent, affecting one property — required a measured escalation: written notification to owner and supervisor, followed by deadline-setting and escalation to county/state building officials only if no action was taken" ;
proeth:confidence "0.93" ;
proeth:discoveredincase "140" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-28T01:26:05.014062+00:00" ;
proeth:firstdiscoveredincase "140" ;
proeth:generatedattime "2026-02-28T01:26:05.014062+00:00" ;
proeth:importance "high" ;
proeth:interpretation "The non-imminent and limited scope of the barn structural risk permitted a graduated response with deadlines rather than immediate multi-authority escalation" ;
proeth:invokedby "Engineer A BER 07-10 Prior Design Engineer Barn" ;
proeth:principleclass "Proportional Escalation Obligation Calibrated to Imminence and Breadth of Risk" ;
proeth:sourcetext "Engineer A had fulfilled his ethical obligation by notifying the town supervisor, but that Engineer A should also notify the new owner in writing of the perceived deficiency" ;
proeth:tensionresolution "The measured nature of the risk permitted a graduated escalation with deadlines before escalating to county/state building officials" ;
proeth:textreferences "Engineer A had fulfilled his ethical obligation by notifying the town supervisor, but that Engineer A should also notify the new owner in writing of the perceived deficiency",
"If appropriate steps were not taken within a reasonable period of time, Engineer A should have again contact the town supervisor in writing and indicate that if steps are not taken within a specific period of time to adequately address the situation, Engineer A will be required to bring the matter to the attention of county or state building officials, as appropriate" ;
proeth:wasattributedto "Case 140 Extraction" ;
prov:generatedAtTime "2026-02-28T01:40:09.760439"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 140 Extraction" .
Metadata
Extraction details
Discovered in case
140
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-28T01:26:05.014062+00:00
First case
140
Generated
2026-02-28T01:26:05.014062+00:00
Attributed to
Case 140 Extraction
Generated
2026-02-28T01:40:09.760439
Generated by
ProEthica Case 140 Extraction