Engineer A Complete Options Analysis

P · Principle Individual
http://proethica.org/ontology/case/14#Engineer_A_Complete_Options_Analysis
Definition

Engineer A omitted two of the four funding-agency-approved delivery methods, Fixed-Price-Design-Build and Construction-Manager-at-Risk, from the summary memo, presenting only Design-Bid-Build and Progressive-Design-Build as viable options.

Properties
Instance of
CompleteOptionsAnalysisPrinciple
http://proethica.org/ontology/intermediate#CompleteOptionsAnalysisPrinciple
Applied to
City B wastewater project delivery method selection
Balancing with
Loyalty
Concrete expression
Engineer A omitted two of the four funding-agency-approved delivery methods, Fixed-Price-Design-Build and Construction-Manager-at-Risk, from the summary memo, presenting only Design-Bid-Build and Progressive-Design-Build as viable options.
Confidence
0.92
Interpretation
The principle required Engineer A to analyze all four approved delivery methods and to disclose and justify any exclusion. The omission of Construction-Manager-at-Risk is particularly significant because Engineer A is also qualified to provide services under that method, and its exclusion cannot be explained by Engineer A's own competence limitations.
Tension resolution
The complete options analysis obligation was not satisfied. The selective presentation of options shaped City B's decision space in a manner that favored the option under which Engineer A could provide services.
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
appliedTo
balancingWith
concreteExpression
confidence
interpretation
principleClass
tensionResolution
textReferences
Relationships
invokedBy Agent Engineer A
Source Evidence
Text references
Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options.
Under the proposed funding source, there are four approved project delivery methods: Design-Bid-Build, Construction-Management-at-Risk, Fixed-Price-Design-Build, and Progressive-Design-Build.

Source text
Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options.
TTL
@prefix case14: <http://proethica.org/ontology/case/14#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix proeth-prov: <http://proethica.org/provenance#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix skos: <http://www.w3.org/2004/02/skos/core#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case14:Engineer_A_Complete_Options_Analysis a proeth:CompleteOptionsAnalysisPrinciple, owl:NamedIndividual ; rdfs:label "Engineer A Complete Options Analysis" ; proeth-core:invokedBy case14:Agent_Engineer_A ; proeth:appliedTo "City B wastewater project delivery method selection" ; proeth:balancingWith "Loyalty" ; proeth:conceptCategory "Principle" ; proeth:concreteExpression "Engineer A omitted two of the four funding-agency-approved delivery methods, Fixed-Price-Design-Build and Construction-Manager-at-Risk, from the summary memo, presenting only Design-Bid-Build and Progressive-Design-Build as viable options." ; proeth:confidence "0.92" ; proeth:interpretation "The principle required Engineer A to analyze all four approved delivery methods and to disclose and justify any exclusion. The omission of Construction-Manager-at-Risk is particularly significant because Engineer A is also qualified to provide services under that method, and its exclusion cannot be explained by Engineer A's own competence limitations." ; proeth:invokedBy "Engineer A Delivery Advisor Incomplete" ; proeth:principleClass "Complete Options Analysis Principle" ; proeth:tensionResolution "The complete options analysis obligation was not satisfied. The selective presentation of options shaped City B's decision space in a manner that favored the option under which Engineer A could provide services." ; proeth:textReferences "Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options.", "Under the proposed funding source, there are four approved project delivery methods: Design-Bid-Build, Construction-Management-at-Risk, Fixed-Price-Design-Build, and Progressive-Design-Build." ; proeth-prov:discoveredInCase 14 ; proeth-prov:discoveredInPass 2 ; proeth-prov:discoveredInSection "facts" ; proeth-prov:firstDiscoveredAt "2026-06-04T08:43:46.016802+00:00"^^xsd:dateTime ; proeth-prov:firstDiscoveredInCase 14 ; proeth-prov:matchConfidence 0.0 ; proeth-prov:matchesExisting false ; proeth-prov:sourceText "Engineer A prepared a summary memo to City B Administrator and only identified Design-Bid-Build and Progressive-Design-Build as viable project delivery options." ; proeth-prov:synthesisLiteral "appliedTo", "balancingWith", "concreteExpression", "confidence", "interpretation", "principleClass", "tensionResolution", "textReferences" ; rdfs:comment "Engineer A omitted two of the four funding-agency-approved delivery methods, Fixed-Price-Design-Build and Construction-Manager-at-Risk, from the summary memo, presenting only Design-Bid-Build and Progressive-Design-Build as viable options." ; skos:definition "Engineer A omitted two of the four funding-agency-approved delivery methods, Fixed-Price-Design-Build and Construction-Manager-at-Risk, from the summary memo, presenting only Design-Bid-Build and Progressive-Design-Build as viable options." ; prov:generatedAtTime "2026-06-04T08:43:46.016802+00:00"^^xsd:dateTime ; prov:wasAttributedTo "Case 14 Extraction", "claude-sonnet-4-6" ; prov:wasGeneratedBy "ProEthica Case 14 Extraction" .
Metadata
Type
Individual
Last Updated
2026-06-05 09:40
Discovered in case
14
Discovered in pass
2
Discovered in section
facts
First discovered
2026-06-04T08:43:46.016802+00:00
First case
14
Generated
2026-06-04T08:43:46.016802+00:00
Attributed to
['Case 14 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 14 Extraction