Preliminary-Site-Investigation-Studies

Rs · Resource Individual
http://proethica.org/ontology/case/137#Preliminary-Site-Investigation-Studies
Properties
Instance of
ReferenceMaterial
http://proethica.org/ontology/intermediate#ReferenceMaterial
Confidence
0.82
Created by
Engineering consultants and government agencies
Document title
Preliminary Site Investigation Studies (Environmental, Geological, Right-of-Way)
Importance
medium
Used by
Engineer A and state/federal transportation departments in planning bridge replacement
Used in context
Supporting documentation for the bridge replacement project, providing environmental, geological, and right-of-way data necessary for the design-build contract approach
Version
Initiated after June 2000 closure
Source Evidence
Source text
Preliminary site investigation studies were begun

Text references
A decision was made to use a design build contract to avoid a lengthy scour analysis for the pile design
Environmental, geological, right-of-way, and other studies were also performed
Preliminary site investigation studies were begun
TTL
@prefix case137: <http://proethica.org/ontology/case/137#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case137:Preliminary-Site-Investigation-Studies a proeth:ReferenceMaterial, owl:NamedIndividual ; rdfs:label "Preliminary-Site-Investigation-Studies" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.82" ; proeth:createdby "Engineering consultants and government agencies" ; proeth:discoveredincase "137" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:documenttitle "Preliminary Site Investigation Studies (Environmental, Geological, Right-of-Way)" ; proeth:firstdiscoveredat "2026-03-01T05:16:16.262629+00:00" ; proeth:firstdiscoveredincase "137" ; proeth:generatedattime "2026-03-01T05:16:16.262629+00:00" ; proeth:importance "medium" ; proeth:resourceclass "Reference Material" ; proeth:sourcetext "Preliminary site investigation studies were begun" ; proeth:textreferences "A decision was made to use a design build contract to avoid a lengthy scour analysis for the pile design", "Environmental, geological, right-of-way, and other studies were also performed", "Preliminary site investigation studies were begun" ; proeth:usedby "Engineer A and state/federal transportation departments in planning bridge replacement" ; proeth:usedincontext "Supporting documentation for the bridge replacement project, providing environmental, geological, and right-of-way data necessary for the design-build contract approach" ; proeth:version "Initiated after June 2000 closure" ; proeth:wasattributedto "Case 137 Extraction" ; prov:generatedAtTime "2026-03-01T05:45:21.982858"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 137 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
137
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T05:16:16.262629+00:00
First case
137
Generated
2026-03-01T05:16:16.262629+00:00
Attributed to
Case 137 Extraction
Generated
2026-03-01T05:45:21.982858
Generated by
ProEthica Case 137 Extraction