Engineer A Post-Remediation Licensed Inspection Prerequisite
O · Obligation
Individual
http://proethica.org/ontology/case/137#Engineer_A_Post-Remediation_Licensed_Inspection_Prerequisite
Properties
Instance of
Post-RemediationLicensedEngineeringInspectionPrerequisiteObligation
http://proethica.org/ontology/intermediate#Post-RemediationLicensedEngineeringInspectionPrerequisiteObligation
Case context
Crutch piles were installed under the condemned bridge and the bridge was reopened with a 5-ton limit, but no follow-up licensed engineering inspection was undertaken before reopening.
Compliance status
unclear
Confidence
0.94
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A was obligated to require that a formal licensed engineering inspection be conducted after crutch pile installation and before the bridge was reopened to public use, and to escalate to appropriate authorities when no such inspection was performed.
Temporal scope
Prior to and immediately following the bridge reopening after crutch pile installation
Relationships
competesWith
Engineer A Condemned Bridge Reopening Resistance
prevailsOver
Engineer A Condemned Bridge Reopening Resistance
derivedFromPrinciple
Post-Remediation Inspection Obligation Violated in Bridge Crutch Pile Installation
Source Evidence
Source text
A decision was made to install two crutch piles under the bridge and to open the bridge with a 5-ton limit.
Text references
A decision was made to install two crutch piles under the bridge and to open the bridge with a 5-ton limit.
No follow-up inspection was undertaken.
TTL
@prefix case137: <http://proethica.org/ontology/case/137#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case137:Engineer_A_Post-Remediation_Licensed_Inspection_Prerequisite a proeth:Post-RemediationLicensedEngineeringInspectionPrerequisiteObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Post-Remediation Licensed Inspection Prerequisite" ;
proeth-core:competesWith case137:Engineer_A_Condemned_Bridge_Reopening_Resistance ;
proeth-core:defeasibleUnder case137:Absent_Post-Remediation_Inspection_After_Crutch_Pile_Installation ;
proeth-core:prevailsOver case137:Engineer_A_Condemned_Bridge_Reopening_Resistance ;
proeth:casecontext "Crutch piles were installed under the condemned bridge and the bridge was reopened with a 5-ton limit, but no follow-up licensed engineering inspection was undertaken before reopening." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.94" ;
proeth:derivedFromPrinciple case137:Post-Remediation_Inspection_Obligation_Violated_in_Bridge_Crutch_Pile_Installation ;
proeth:discoveredincase "137" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T05:25:33.100530+00:00" ;
proeth:firstdiscoveredincase "137" ;
proeth:generatedattime "2026-03-01T05:25:33.100530+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Post-Remediation Licensed Engineering Inspection Prerequisite Obligation" ;
proeth:obligationstatement "Engineer A was obligated to require that a formal licensed engineering inspection be conducted after crutch pile installation and before the bridge was reopened to public use, and to escalate to appropriate authorities when no such inspection was performed." ;
proeth:sourcetext "A decision was made to install two crutch piles under the bridge and to open the bridge with a 5-ton limit." ;
proeth:temporalscope "Prior to and immediately following the bridge reopening after crutch pile installation" ;
proeth:textreferences "A decision was made to install two crutch piles under the bridge and to open the bridge with a 5-ton limit.",
"No follow-up inspection was undertaken." ;
proeth:wasattributedto "Case 137 Extraction" ;
prov:generatedAtTime "2026-03-01T05:45:21.959424"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 137 Extraction" .
Metadata
Extraction details
Discovered in case
137
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T05:25:33.100530+00:00
First case
137
Generated
2026-03-01T05:25:33.100530+00:00
Attributed to
Case 137 Extraction
Generated
2026-03-01T05:45:21.959424
Generated by
ProEthica Case 137 Extraction