Engineer A Immediate Bridge Closure Friday Afternoon
O · Obligation
Individual
http://proethica.org/ontology/case/137#Engineer_A_Immediate_Bridge_Closure_Friday_Afternoon
Properties
Instance of
ImmediateBridgeClosureUponCredibleSafetyNotificationObligation
http://proethica.org/ontology/intermediate#ImmediateBridgeClosureUponCredibleSafetyNotificationObligation
Case context
Engineer A received a telephone call from the bridge inspector on a Friday afternoon stating the bridge needed to be closed due to the large number of rotten pilings. Engineer A had barricades and signs erected within the hour.
Compliance status
met
Confidence
0.97
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A was obligated to immediately close the bridge upon receiving the bridge inspector's credible telephone report of rotten pilings, without waiting for a formal written report or supervisory approval.
Temporal scope
Immediately upon receipt of the bridge inspector's telephone call in June 2000
Relationships
defeasibleUnder
Public Safety at Risk from Bridge Use
derivedFromPrinciple
Public Welfare Paramount Invoked by Engineer A in Immediate Bridge Closure
Source Evidence
Source text
In June 2000, Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling.
Text references
Engineer A had barricades and signs erected within the hour on a Friday afternoon.
In June 2000, Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling.
TTL
@prefix case137: <http://proethica.org/ontology/case/137#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case137:Engineer_A_Immediate_Bridge_Closure_Friday_Afternoon a proeth:ImmediateBridgeClosureUponCredibleSafetyNotificationObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Immediate Bridge Closure Friday Afternoon" ;
proeth-core:defeasibleUnder case137:Public_Safety_at_Risk_from_Bridge_Use ;
proeth:casecontext "Engineer A received a telephone call from the bridge inspector on a Friday afternoon stating the bridge needed to be closed due to the large number of rotten pilings. Engineer A had barricades and signs erected within the hour." ;
proeth:compliancestatus "met" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.97" ;
proeth:derivedFromPrinciple case137:Public_Welfare_Paramount_Invoked_by_Engineer_A_in_Immediate_Bridge_Closure ;
proeth:discoveredincase "137" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T05:25:33.100530+00:00" ;
proeth:firstdiscoveredincase "137" ;
proeth:generatedattime "2026-03-01T05:25:33.100530+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Immediate Bridge Closure Upon Credible Safety Notification Obligation" ;
proeth:obligationstatement "Engineer A was obligated to immediately close the bridge upon receiving the bridge inspector's credible telephone report of rotten pilings, without waiting for a formal written report or supervisory approval." ;
proeth:sourcetext "In June 2000, Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling." ;
proeth:temporalscope "Immediately upon receipt of the bridge inspector's telephone call in June 2000" ;
proeth:textreferences "Engineer A had barricades and signs erected within the hour on a Friday afternoon.",
"In June 2000, Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling." ;
proeth:wasattributedto "Case 137 Extraction" ;
prov:generatedAtTime "2026-03-01T05:45:21.958505"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 137 Extraction" .
Metadata
Extraction details
Discovered in case
137
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T05:25:33.100530+00:00
First case
137
Generated
2026-03-01T05:25:33.100530+00:00
Attributed to
Case 137 Extraction
Generated
2026-03-01T05:45:21.958505
Generated by
ProEthica Case 137 Extraction