Bridge-Inspector-Telephone-Report
Rs · Resource
Individual
http://proethica.org/ontology/case/137#Bridge-Inspector-Telephone-Report
Properties
Instance of
BridgeInspectionReportingStandard
http://proethica.org/ontology/intermediate#BridgeInspectionReportingStandard
Confidence
0.88
Created by
Bridge inspector (consulting or government)
Document title
Bridge Inspector's Verbal Closure Notification
Importance
high
Used by
Engineer A as basis for erecting barricades and signs within one hour
Used in context
Triggered Engineer A's immediate emergency closure action; represents the professional inspection finding that initiated the public safety response
Version
June 2000
Source Evidence
Source text
Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling
Text references
Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling
TTL
@prefix case137: <http://proethica.org/ontology/case/137#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case137:Bridge-Inspector-Telephone-Report a proeth:BridgeInspectionReportingStandard,
owl:NamedIndividual ;
rdfs:label "Bridge-Inspector-Telephone-Report" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.88" ;
proeth:createdby "Bridge inspector (consulting or government)" ;
proeth:discoveredincase "137" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:documenttitle "Bridge Inspector's Verbal Closure Notification" ;
proeth:firstdiscoveredat "2026-03-01T05:16:16.262629+00:00" ;
proeth:firstdiscoveredincase "137" ;
proeth:generatedattime "2026-03-01T05:16:16.262629+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Bridge Inspection Reporting Standard" ;
proeth:sourcetext "Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling" ;
proeth:textreferences "Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling" ;
proeth:usedby "Engineer A as basis for erecting barricades and signs within one hour" ;
proeth:usedincontext "Triggered Engineer A's immediate emergency closure action; represents the professional inspection finding that initiated the public safety response" ;
proeth:version "June 2000" ;
proeth:wasattributedto "Case 137 Extraction" ;
prov:generatedAtTime "2026-03-01T05:45:21.981750"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 137 Extraction" .
Metadata
Extraction details
Discovered in case
137
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T05:16:16.262629+00:00
First case
137
Generated
2026-03-01T05:16:16.262629+00:00
Attributed to
Case 137 Extraction
Generated
2026-03-01T05:45:21.981750
Generated by
ProEthica Case 137 Extraction