Bridge-Inspector-Telephone-Report

Rs · Resource Individual
http://proethica.org/ontology/case/137#Bridge-Inspector-Telephone-Report
Properties
Instance of
BridgeInspectionReportingStandard
http://proethica.org/ontology/intermediate#BridgeInspectionReportingStandard
Confidence
0.88
Created by
Bridge inspector (consulting or government)
Document title
Bridge Inspector's Verbal Closure Notification
Importance
high
Used by
Engineer A as basis for erecting barricades and signs within one hour
Used in context
Triggered Engineer A's immediate emergency closure action; represents the professional inspection finding that initiated the public safety response
Version
June 2000
Source Evidence
Source text
Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling

Text references
Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling
TTL
@prefix case137: <http://proethica.org/ontology/case/137#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case137:Bridge-Inspector-Telephone-Report a proeth:BridgeInspectionReportingStandard, owl:NamedIndividual ; rdfs:label "Bridge-Inspector-Telephone-Report" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.88" ; proeth:createdby "Bridge inspector (consulting or government)" ; proeth:discoveredincase "137" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:documenttitle "Bridge Inspector's Verbal Closure Notification" ; proeth:firstdiscoveredat "2026-03-01T05:16:16.262629+00:00" ; proeth:firstdiscoveredincase "137" ; proeth:generatedattime "2026-03-01T05:16:16.262629+00:00" ; proeth:importance "high" ; proeth:resourceclass "Bridge Inspection Reporting Standard" ; proeth:sourcetext "Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling" ; proeth:textreferences "Engineer A received a telephone call from the bridge inspector stating this bridge needed to be closed due to the large number of rotten piling" ; proeth:usedby "Engineer A as basis for erecting barricades and signs within one hour" ; proeth:usedincontext "Triggered Engineer A's immediate emergency closure action; represents the professional inspection finding that initiated the public safety response" ; proeth:version "June 2000" ; proeth:wasattributedto "Case 137 Extraction" ; prov:generatedAtTime "2026-03-01T05:45:21.981750"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 137 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
137
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T05:16:16.262629+00:00
First case
137
Generated
2026-03-01T05:16:16.262629+00:00
Attributed to
Case 137 Extraction
Generated
2026-03-01T05:45:21.981750
Generated by
ProEthica Case 137 Extraction