BER 84-5: Public Safety at Risk from Dangerous Construction Without Oversight
S · State
Individual
http://proethica.org/ontology/case/136#BER_84-5:_Public_Safety_at_Risk_from_Dangerous_Construction_Without_Oversight
Properties
Instance of
Active period
From project commencement without on-site representative through project completion
Affected parties
Client
Construction workers
Engineer A
Public
Confidence
0.93
Importance
high
Subject
Construction project with potentially dangerous implementation phase lacking required safety oversight
Terminated by
Project completion (risk persisted throughout without mitigation)
Triggering event
Engineer A's recognition that the construction phase was potentially dangerous and required full-time on-site oversight
Urgency level
high
Source Evidence
Source text
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommended to the client that a full-time, on-site project representative should be hired for the project
Text references
Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommended to the client that a full-time, on-site project representative should be hired for the project
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
<http://proethica.org/ontology/case/136#BER_84-5:_Public_Safety_at_Risk_from_Dangerous_Construction_Without_Oversight> a proeth:PublicSafetyatRisk,
owl:NamedIndividual ;
rdfs:label "BER 84-5: Public Safety at Risk from Dangerous Construction Without Oversight" ;
proeth:activeperiod "From project commencement without on-site representative through project completion" ;
proeth:affectedparties "Client",
"Construction workers",
"Engineer A",
"Public" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.93" ;
proeth:discoveredincase "136" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-03-01T12:53:52.514196+00:00" ;
proeth:firstdiscoveredincase "136" ;
proeth:generatedattime "2026-03-01T12:53:52.514196+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommended to the client that a full-time, on-site project representative should be hired for the project" ;
proeth:stateclass "Public Safety at Risk" ;
proeth:subject "Construction project with potentially dangerous implementation phase lacking required safety oversight" ;
proeth:terminatedby "Project completion (risk persisted throughout without mitigation)" ;
proeth:textreferences "Because of the potentially dangerous nature of implementing the design during the construction phase, Engineer A recommended to the client that a full-time, on-site project representative should be hired for the project" ;
proeth:triggeringevent "Engineer A's recognition that the construction phase was potentially dangerous and required full-time on-site oversight" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 136 Extraction" ;
prov:generatedAtTime "2026-03-01T13:14:37.515070"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 136 Extraction" .
Metadata
Extraction details
Discovered in case
136
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-03-01T12:53:52.514196+00:00
First case
136
Generated
2026-03-01T12:53:52.514196+00:00
Attributed to
Case 136 Extraction
Generated
2026-03-01T13:14:37.515070
Generated by
ProEthica Case 136 Extraction