Material Harm Potential from Engineer A's Misrepresentation - Present Case
S · State
Individual
http://proethica.org/ontology/case/134#Material_Harm_Potential_from_Engineer_As_Misrepresentation_-_Present_Case
Properties
Instance of
MaterialHarmPotentialinBusinessNegotiationState
http://proethica.org/ontology/intermediate#MaterialHarmPotentialinBusinessNegotiationState
Active period
From the point of Engineer A's misleading statements through conclusion of negotiation
Affected parties
Engineer A
Engineer B (potential purchaser)
Engineer C
Confidence
0.86
Importance
high
Subject
Engineer B's position as counterparty to Engineer A's misleading negotiation statements
Terminated by
Not terminated within the case — full disclosure was not made
Triggering event
Engineer A making artfully misleading statements about Engineer C without full disclosure of circumstances
Urgency level
high
Source Evidence
Source text
The facts of this case suggest potential material harm to an interested party during negotiations
Text references
The facts of this case suggest potential material harm to an interested party during negotiations
if Engineer A had fully disclosed the full circumstances relating to Engineer C, the Board's conclusion would have been different
TTL
@prefix case134: <http://proethica.org/ontology/case/134#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case134:Material_Harm_Potential_from_Engineer_As_Misrepresentation_-_Present_Case a proeth:MaterialHarmPotentialinBusinessNegotiationState,
owl:NamedIndividual ;
rdfs:label "Material Harm Potential from Engineer A's Misrepresentation - Present Case" ;
proeth:activeperiod "From the point of Engineer A's misleading statements through conclusion of negotiation" ;
proeth:affectedparties "Engineer A",
"Engineer B (potential purchaser)",
"Engineer C" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.86" ;
proeth:discoveredincase "134" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-28T21:13:46.625483+00:00" ;
proeth:firstdiscoveredincase "134" ;
proeth:generatedattime "2026-02-28T21:13:46.625483+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "The facts of this case suggest potential material harm to an interested party during negotiations" ;
proeth:stateclass "Material Harm Potential in Business Negotiation State" ;
proeth:subject "Engineer B's position as counterparty to Engineer A's misleading negotiation statements" ;
proeth:terminatedby "Not terminated within the case — full disclosure was not made" ;
proeth:textreferences "The facts of this case suggest potential material harm to an interested party during negotiations",
"if Engineer A had fully disclosed the full circumstances relating to Engineer C, the Board's conclusion would have been different" ;
proeth:triggeringevent "Engineer A making artfully misleading statements about Engineer C without full disclosure of circumstances" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 134 Extraction" ;
prov:generatedAtTime "2026-02-28T21:30:32.613402"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 134 Extraction" .
Metadata
Extraction details
Discovered in case
134
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-28T21:13:46.625483+00:00
First case
134
Generated
2026-02-28T21:13:46.625483+00:00
Attributed to
Case 134 Extraction
Generated
2026-02-28T21:30:32.613402
Generated by
ProEthica Case 134 Extraction