Bridge_Inspection_Reporting_Standard_Instance
Rs · Resource
Individual
http://proethica.org/ontology/case/133#Bridge_Inspection_Reporting_Standard_Instance
Properties
Instance of
BridgeInspectionReportingStandard
http://proethica.org/ontology/intermediate#BridgeInspectionReportingStandard
Confidence
0.88
Created by
Consulting engineering firm (unnamed)
Document title
Bridge Inspection Reporting Standard (Consulting Engineering Firm Report)
Importance
high
Used by
Engineer A and the NSPE Board of Ethical Review as the technical foundation for the safety concern
Used in context
The signed and sealed detailed inspection report prepared by a consulting engineering firm, identifying seven pilings requiring replacement, serves as the technical basis for Engineer A's safety determination and subsequent escalation obligations
Version
Current at time of case
Source Evidence
Source text
Within a few days, a detailed inspection report prepared by a consulting engineering firm, signed and sealed, indicated seven pilings required replacement.
Text references
Within a few days, a detailed inspection report prepared by a consulting engineering firm, signed and sealed, indicated seven pilings required replacement.
TTL
@prefix case133: <http://proethica.org/ontology/case/133#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case133:Bridge_Inspection_Reporting_Standard_Instance a proeth:BridgeInspectionReportingStandard,
owl:NamedIndividual ;
rdfs:label "Bridge_Inspection_Reporting_Standard_Instance" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.88" ;
proeth:createdby "Consulting engineering firm (unnamed)" ;
proeth:discoveredincase "133" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:documenttitle "Bridge Inspection Reporting Standard (Consulting Engineering Firm Report)" ;
proeth:firstdiscoveredat "2026-02-28T16:26:19.864245+00:00" ;
proeth:firstdiscoveredincase "133" ;
proeth:generatedattime "2026-02-28T16:26:19.864245+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Bridge Inspection Reporting Standard" ;
proeth:sourcetext "Within a few days, a detailed inspection report prepared by a consulting engineering firm, signed and sealed, indicated seven pilings required replacement." ;
proeth:textreferences "Within a few days, a detailed inspection report prepared by a consulting engineering firm, signed and sealed, indicated seven pilings required replacement." ;
proeth:usedby "Engineer A and the NSPE Board of Ethical Review as the technical foundation for the safety concern" ;
proeth:usedincontext "The signed and sealed detailed inspection report prepared by a consulting engineering firm, identifying seven pilings requiring replacement, serves as the technical basis for Engineer A's safety determination and subsequent escalation obligations" ;
proeth:version "Current at time of case" ;
proeth:wasattributedto "Case 133 Extraction" ;
prov:generatedAtTime "2026-02-28T16:47:31.561778"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 133 Extraction" .
Metadata
Extraction details
Discovered in case
133
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-28T16:26:19.864245+00:00
First case
133
Generated
2026-02-28T16:26:19.864245+00:00
Attributed to
Case 133 Extraction
Generated
2026-02-28T16:47:31.561778
Generated by
ProEthica Case 133 Extraction