BER 00-5 Multi-Authority Escalation Obligation

S · State Individual
http://proethica.org/ontology/case/133#BER_00-5_Multi-Authority_Escalation_Obligation
Properties
Instance of
Multi-AuthorityEscalationObligationState
http://proethica.org/ontology/intermediate#Multi-AuthorityEscalationObligationState
Active period
From the moment Engineer A observed overweight traffic crossing the bridge through the period requiring escalation
Affected parties
Bridge users
County prosecutors
County supervisor
Engineer A (BER 00-5)
State engineering licensure board
State/federal transportation officials
Confidence
0.93
Importance
high
Subject
Engineer A's (BER 00-5) obligation to contact multiple authorities simultaneously given imminent bridge collapse risk and non-engineer override of engineering safety closure
Terminated by
Not terminated within case facts — escalation obligation remained active
Triggering event
Bridge reopened with five-ton limit but log trucks and tankers crossing regularly; significant bridge movement observed
Urgency level
critical
Source Evidence
Source text
Engineer A should have taken immediate steps to go to Engineer A's supervisor to press for strict enforcement of the five-ton limit

Text references
Engineer A should have taken immediate steps to contact the county governing authority and county prosecutors, state and/or federal transportation/highway officials, the state engineering licensure board, and other authorities
Engineer A should have taken immediate steps to go to Engineer A's supervisor to press for strict enforcement of the five-ton limit
contact state and/or federal transportation/highway officials, the state engineering licensure board, the director of public works, county commissioners, state officials, and such other authorities as appropriate
TTL
@prefix case133: <http://proethica.org/ontology/case/133#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case133:BER_00-5_Multi-Authority_Escalation_Obligation a proeth:Multi-AuthorityEscalationObligationState, owl:NamedIndividual ; rdfs:label "BER 00-5 Multi-Authority Escalation Obligation" ; proeth:activeperiod "From the moment Engineer A observed overweight traffic crossing the bridge through the period requiring escalation" ; proeth:affectedparties "Bridge users", "County prosecutors", "County supervisor", "Engineer A (BER 00-5)", "State engineering licensure board", "State/federal transportation officials" ; proeth:conceptCategory "State" ; proeth:confidence "0.93" ; proeth:discoveredincase "133" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-28T16:27:23.418687+00:00" ; proeth:firstdiscoveredincase "133" ; proeth:generatedattime "2026-02-28T16:27:23.418687+00:00" ; proeth:importance "high" ; proeth:sourcetext "Engineer A should have taken immediate steps to go to Engineer A's supervisor to press for strict enforcement of the five-ton limit" ; proeth:stateclass "Multi-Authority Escalation Obligation State" ; proeth:subject "Engineer A's (BER 00-5) obligation to contact multiple authorities simultaneously given imminent bridge collapse risk and non-engineer override of engineering safety closure" ; proeth:terminatedby "Not terminated within case facts — escalation obligation remained active" ; proeth:textreferences "Engineer A should have taken immediate steps to contact the county governing authority and county prosecutors, state and/or federal transportation/highway officials, the state engineering licensure board, and other authorities", "Engineer A should have taken immediate steps to go to Engineer A's supervisor to press for strict enforcement of the five-ton limit", "contact state and/or federal transportation/highway officials, the state engineering licensure board, the director of public works, county commissioners, state officials, and such other authorities as appropriate" ; proeth:triggeringevent "Bridge reopened with five-ton limit but log trucks and tankers crossing regularly; significant bridge movement observed" ; proeth:urgencylevel "critical" ; proeth:wasattributedto "Case 133 Extraction" ; prov:generatedAtTime "2026-02-28T16:47:31.556087"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 133 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
133
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-28T16:27:23.418687+00:00
First case
133
Generated
2026-02-28T16:27:23.418687+00:00
Attributed to
Case 133 Extraction
Generated
2026-02-28T16:47:31.556087
Generated by
ProEthica Case 133 Extraction