Engineer-Notification-Right-in-Review-Contexts-Instance
Rs · Resource
Individual
http://proethica.org/ontology/case/126#Engineer-Notification-Right-in-Review-Contexts-Instance
Properties
Instance of
EngineerNotificationRightinReviewContexts
http://proethica.org/ontology/intermediate#EngineerNotificationRightinReviewContexts
Confidence
0.92
Created by
NSPE Board of Ethical Review / professional consensus
Document title
Engineer's Right to Be Informed When Work Is Under Review
Importance
high
Used by
Engineer B in justifying notification to Engineer A prior to or immediately following the review
Used in context
Establishes Engineer A's professional right to be notified that Engineer B has been retained to review Engineer A's pending design work, grounding Engineer B's ultimate decision to notify despite the franchiser's instruction
Version
Current NSPE interpretation
Source Evidence
Source text
Engineer B reviews the design information the following week and following his review, notifies Engineer A of his relationship with franchiser and the preliminary results of his review
Text references
Engineer B reviews the design information the following week and following his review, notifies Engineer A of his relationship with franchiser and the preliminary results of his review
TTL
@prefix case126: <http://proethica.org/ontology/case/126#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case126:Engineer-Notification-Right-in-Review-Contexts-Instance a proeth:EngineerNotificationRightinReviewContexts,
owl:NamedIndividual ;
rdfs:label "Engineer-Notification-Right-in-Review-Contexts-Instance" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.92" ;
proeth:createdby "NSPE Board of Ethical Review / professional consensus" ;
proeth:discoveredincase "126" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:documenttitle "Engineer's Right to Be Informed When Work Is Under Review" ;
proeth:firstdiscoveredat "2026-03-01T10:09:52.574434+00:00" ;
proeth:firstdiscoveredincase "126" ;
proeth:generatedattime "2026-03-01T10:09:52.574434+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Engineer Notification Right in Review Contexts" ;
proeth:sourcetext "Engineer B reviews the design information the following week and following his review, notifies Engineer A of his relationship with franchiser and the preliminary results of his review" ;
proeth:textreferences "Engineer B reviews the design information the following week and following his review, notifies Engineer A of his relationship with franchiser and the preliminary results of his review" ;
proeth:usedby "Engineer B in justifying notification to Engineer A prior to or immediately following the review" ;
proeth:usedincontext "Establishes Engineer A's professional right to be notified that Engineer B has been retained to review Engineer A's pending design work, grounding Engineer B's ultimate decision to notify despite the franchiser's instruction" ;
proeth:version "Current NSPE interpretation" ;
proeth:wasattributedto "Case 126 Extraction" ;
prov:generatedAtTime "2026-03-01T10:31:55.137744"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 126 Extraction" .
Metadata
Extraction details
Discovered in case
126
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T10:09:52.574434+00:00
First case
126
Generated
2026-03-01T10:09:52.574434+00:00
Attributed to
Case 126 Extraction
Generated
2026-03-01T10:31:55.137744
Generated by
ProEthica Case 126 Extraction