Case context
Engineer A has identified the shortest workable route (saving 30 minutes from a two-hour trip) but this route requires addressing the impact to a historic family farmhouse. The engineer must present all alternatives, not merely the shortest route.
Compliance status
unclear
Confidence
0.89
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to present the state with a complete comparative analysis of all workable route alternatives — including the shortest route requiring eminent domain of the historic farmhouse, longer routes avoiding the property, and any hybrid alternatives — with full analysis of travel time savings, property impacts, historic resource consequences, cost, and public welfare tradeoffs, so that the state can make a fully informed route selection decision.
Temporal scope
As part of the route specification deliverable under the state contract
Relationships
defeasibleUnder
Competing Route Design Approaches, Engineer A Faithful Agent Boundary
Source Evidence
Source text
Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.
Text references
Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.
However, in order to build the shortest route, the state would be required to address the impact to a historic family farmhouse that has existed for over 100 years on the land required for the route.
TTL
@prefix case123: <http://proethica.org/ontology/case/123#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case123:Route_Alternative_Complete_Analysis_Engineer_A_JKL_State_Contract a proeth:RouteAlternativeCompleteComparativeAnalysisObligation,
owl:NamedIndividual ;
rdfs:label "Route Alternative Complete Analysis Engineer A JKL State Contract" ;
proeth-core:defeasibleUnder case123:Competing_Route_Design_Approaches,
case123:Engineer_A_Faithful_Agent_Boundary ;
proeth:casecontext "Engineer A has identified the shortest workable route (saving 30 minutes from a two-hour trip) but this route requires addressing the impact to a historic family farmhouse. The engineer must present all alternatives, not merely the shortest route." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.89" ;
proeth:derivedFromPrinciple case123:Historic_Cultural_Resource_Impact_Invoked_By_Engineer_A_Farmhouse_Route,
case123:Historic_and_Cultural_Resource_Impact_Consideration_Invoked_in_Route_Selection ;
proeth:discoveredincase "123" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-28T00:00:48.240876+00:00" ;
proeth:firstdiscoveredincase "123" ;
proeth:generatedattime "2026-02-28T00:00:48.240876+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Route Alternative Complete Comparative Analysis Obligation" ;
proeth:obligationstatement "Engineer A is obligated to present the state with a complete comparative analysis of all workable route alternatives — including the shortest route requiring eminent domain of the historic farmhouse, longer routes avoiding the property, and any hybrid alternatives — with full analysis of travel time savings, property impacts, historic resource consequences, cost, and public welfare tradeoffs, so that the state can make a fully informed route selection decision." ;
proeth:sourcetext "Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip." ;
proeth:temporalscope "As part of the route specification deliverable under the state contract" ;
proeth:textreferences "Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.",
"However, in order to build the shortest route, the state would be required to address the impact to a historic family farmhouse that has existed for over 100 years on the land required for the route." ;
proeth:wasattributedto "Case 123 Extraction" ;
prov:generatedAtTime "2026-02-28T00:14:43.750011"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 123 Extraction" .
Metadata
Extraction details
Discovered in case
123
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-28T00:00:48.240876+00:00
First case
123
Generated
2026-02-28T00:00:48.240876+00:00
Attributed to
Case 123 Extraction
Generated
2026-02-28T00:14:43.750011
Generated by
ProEthica Case 123 Extraction