Engineer A Route Selection Multi-Interest Route Balancing Present Case
O · Obligation
Individual
http://proethica.org/ontology/case/123#Engineer_A_Route_Selection_Multi-Interest_Route_Balancing_Present_Case
Properties
Instance of
Multi-InterestRouteSelectionBalancingObligation
http://proethica.org/ontology/intermediate#Multi-InterestRouteSelectionBalancingObligation
Case context
Engineer A retained by the state to specify a road route connecting two towns; the shortest route requires condemnation of a historic family farmhouse; the Board directs Engineer A to balance all relevant interests.
Compliance status
unclear
Confidence
0.91
Importance
high
Obligated party
Engineer A (Route Selection Design Engineer, present case)
Obligation statement
Engineer A must conduct and present a multi-criteria route evaluation that balances the competing interests of the traveling public (travel time savings), the historic farmhouse owners (displacement and loss of multi-generational family property), the state client (cost, feasibility, and legal authority), and the general public (historic preservation), presenting the tradeoffs among these interests completely and objectively.
Temporal scope
During route specification and advisory process
Relationships
defeasibleUnder
Competing Route Design Approaches, Historic Farmhouse Multi-Party Interest Balancing
derivedFromPrinciple
Multi-Interest Balancing Invoked by Engineer A Route Selection Present Case
Source Evidence
Source text
it is the Board of Ethical Review's position that Engineer A has an ethical obligation to balance the interests of all interested and relevant parties, including the state, the two towns in question, and the owners of the historic family farmhouse.
Text references
it is the Board of Ethical Review's position that Engineer A has an ethical obligation to balance the interests of all interested and relevant parties, including the state, the two towns in question, and the owners of the historic family farmhouse.
TTL
@prefix case123: <http://proethica.org/ontology/case/123#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case123:Engineer_A_Route_Selection_Multi-Interest_Route_Balancing_Present_Case a proeth:Multi-InterestRouteSelectionBalancingObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Route Selection Multi-Interest Route Balancing Present Case" ;
proeth-core:defeasibleUnder case123:Competing_Route_Design_Approaches,
case123:Historic_Farmhouse_Multi-Party_Interest_Balancing ;
proeth:casecontext "Engineer A retained by the state to specify a road route connecting two towns; the shortest route requires condemnation of a historic family farmhouse; the Board directs Engineer A to balance all relevant interests." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.91" ;
proeth:derivedFromPrinciple case123:Multi-Interest_Balancing_Invoked_by_Engineer_A_Route_Selection_Present_Case ;
proeth:discoveredincase "123" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-28T00:05:45.073046+00:00" ;
proeth:firstdiscoveredincase "123" ;
proeth:generatedattime "2026-02-28T00:05:45.073046+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A (Route Selection Design Engineer, present case)" ;
proeth:obligationclass "Multi-Interest Route Selection Balancing Obligation" ;
proeth:obligationstatement "Engineer A must conduct and present a multi-criteria route evaluation that balances the competing interests of the traveling public (travel time savings), the historic farmhouse owners (displacement and loss of multi-generational family property), the state client (cost, feasibility, and legal authority), and the general public (historic preservation), presenting the tradeoffs among these interests completely and objectively." ;
proeth:sourcetext "it is the Board of Ethical Review's position that Engineer A has an ethical obligation to balance the interests of all interested and relevant parties, including the state, the two towns in question, and the owners of the historic family farmhouse." ;
proeth:temporalscope "During route specification and advisory process" ;
proeth:textreferences "it is the Board of Ethical Review's position that Engineer A has an ethical obligation to balance the interests of all interested and relevant parties, including the state, the two towns in question, and the owners of the historic family farmhouse." ;
proeth:wasattributedto "Case 123 Extraction" ;
prov:generatedAtTime "2026-02-28T00:14:43.766001"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 123 Extraction" .
Metadata
Extraction details
Discovered in case
123
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-28T00:05:45.073046+00:00
First case
123
Generated
2026-02-28T00:05:45.073046+00:00
Attributed to
Case 123 Extraction
Generated
2026-02-28T00:14:43.766001
Generated by
ProEthica Case 123 Extraction