Engineer A Route Selection Amicable Resolution Advisory
O · Obligation
Individual
http://proethica.org/ontology/case/123#Engineer_A_Route_Selection_Amicable_Resolution_Advisory
Properties
Instance of
AmicableResolutionAdvisoryObligation
http://proethica.org/ontology/intermediate#AmicableResolutionAdvisoryObligation
Case context
Engineer A retained by the state to specify a road route; the shortest route requires condemnation of a historic family farmhouse; the Board identifies physical relocation as a potential creative alternative to condemnation.
Compliance status
unclear
Confidence
0.89
Importance
high
Obligated party
Engineer A (Route Selection Design Engineer, retained by JKL Engineering under state contract)
Obligation statement
Engineer A is obligated to advise the state on feasible and reasonable alternative solutions — including the option of physically relocating the historic farmhouse to another appropriate site — in an attempt to reach an amicable resolution consistent with the public interest, before condemnation proceedings are recommended or pursued.
Temporal scope
During route specification and advisory process, prior to final route recommendation
Relationships
defeasibleUnder
Historic Farmhouse Multi-Party Interest Balancing, Shortest Route Eminent Doma in Option
derivedFromPrinciple
Do No Harm Obligation Invoked by Engineer A Route Selection
Source Evidence
Source text
Engineer A has an obligation to advise the state on feasible and reasonable solutions in an attempt to reach an amicable resolution of this matter, consistent with the interests of the public.
Text references
Among these might include an offer to physically move the historic farmhouse to another appropriate site owned by the family or another party.
Engineer A has an obligation to advise the state on feasible and reasonable solutions in an attempt to reach an amicable resolution of this matter, consistent with the interests of the public.
TTL
@prefix case123: <http://proethica.org/ontology/case/123#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case123:Engineer_A_Route_Selection_Amicable_Resolution_Advisory a proeth:AmicableResolutionAdvisoryObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Route Selection Amicable Resolution Advisory" ;
proeth-core:defeasibleUnder case123:Historic_Farmhouse_Multi-Party_Interest_Balancing,
case123:Shortest_Route_Eminent_Domain_Option ;
proeth:casecontext "Engineer A retained by the state to specify a road route; the shortest route requires condemnation of a historic family farmhouse; the Board identifies physical relocation as a potential creative alternative to condemnation." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.89" ;
proeth:derivedFromPrinciple case123:Do_No_Harm_Obligation_Invoked_by_Engineer_A_Route_Selection ;
proeth:discoveredincase "123" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-28T00:05:45.073046+00:00" ;
proeth:firstdiscoveredincase "123" ;
proeth:generatedattime "2026-02-28T00:05:45.073046+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A (Route Selection Design Engineer, retained by JKL Engineering under state contract)" ;
proeth:obligationclass "Amicable Resolution Advisory Obligation" ;
proeth:obligationstatement "Engineer A is obligated to advise the state on feasible and reasonable alternative solutions — including the option of physically relocating the historic farmhouse to another appropriate site — in an attempt to reach an amicable resolution consistent with the public interest, before condemnation proceedings are recommended or pursued." ;
proeth:sourcetext "Engineer A has an obligation to advise the state on feasible and reasonable solutions in an attempt to reach an amicable resolution of this matter, consistent with the interests of the public." ;
proeth:temporalscope "During route specification and advisory process, prior to final route recommendation" ;
proeth:textreferences "Among these might include an offer to physically move the historic farmhouse to another appropriate site owned by the family or another party.",
"Engineer A has an obligation to advise the state on feasible and reasonable solutions in an attempt to reach an amicable resolution of this matter, consistent with the interests of the public." ;
proeth:wasattributedto "Case 123 Extraction" ;
prov:generatedAtTime "2026-02-28T00:14:43.765327"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 123 Extraction" .
Metadata
Extraction details
Discovered in case
123
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-28T00:05:45.073046+00:00
First case
123
Generated
2026-02-28T00:05:45.073046+00:00
Attributed to
Case 123 Extraction
Generated
2026-02-28T00:14:43.765327
Generated by
ProEthica Case 123 Extraction