Creative Third Path Solution Exploration Engineer A Route

O · Obligation Individual
http://proethica.org/ontology/case/123#Creative_Third_Path_Solution_Exploration_Engineer_A_Route
Properties
Instance of
CreativeThird-PathSolutionExplorationObligation
http://proethica.org/ontology/intermediate#CreativeThird-PathSolutionExplorationObligation
Case context
The case presents an apparent binary choice between the shortest route (displacing the historic farmhouse) and longer routes (avoiding it). Engineer A should explore whether creative hybrid solutions exist that partially resolve the tension between travel time efficiency and historic property preservation.
Compliance status
unclear
Confidence
0.82
Importance
medium
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to explore and present creative hybrid or third-path route solutions — such as partial alignments that capture some travel time savings while avoiding the farmhouse footprint, or design modifications that reduce the farmhouse impact — rather than limiting analysis to a binary choice between the shortest route (requiring full condemnation) and longer routes (forgoing all time savings), consistent with the engineer's role as a trustee applying full professional knowledge and creativity to the client's problem.
Temporal scope
During route analysis and before submitting route recommendation to the state client
Source Evidence
Source text
Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.

Text references
Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.
However, in order to build the shortest route, the state would be required to address the impact to a historic family farmhouse that has existed for over 100 years on the land required for the route.
TTL
@prefix case123: <http://proethica.org/ontology/case/123#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case123:Creative_Third_Path_Solution_Exploration_Engineer_A_Route a proeth:CreativeThird-PathSolutionExplorationObligation, owl:NamedIndividual ; rdfs:label "Creative Third Path Solution Exploration Engineer A Route" ; proeth-core:competesWith case123:Eminent_Domain_Availability_Disclosure_Engineer_A_State_Route, case123:Engineer_A_Route_Selection_Greatest_Good_Multi-Interest_Balancing ; proeth-core:defeasibleUnder case123:Historic_Farmhouse_Third-Party_Impact, case123:Shortest_Route_Eminent_Domain_Option ; proeth-core:prevailsOver case123:Eminent_Domain_Availability_Disclosure_Engineer_A_State_Route ; proeth:casecontext "The case presents an apparent binary choice between the shortest route (displacing the historic farmhouse) and longer routes (avoiding it). Engineer A should explore whether creative hybrid solutions exist that partially resolve the tension between travel time efficiency and historic property preservation." ; proeth:compliancestatus "unclear" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.82" ; proeth:derivedFromPrinciple case123:Creative_Alternative_Generation_Obligation_Invoked_by_Engineer_A_Route_Selection ; proeth:discoveredincase "123" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-28T00:00:48.240876+00:00" ; proeth:firstdiscoveredincase "123" ; proeth:generatedattime "2026-02-28T00:00:48.240876+00:00" ; proeth:importance "medium" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "Creative Third-Path Solution Exploration Obligation" ; proeth:obligationstatement "Engineer A is obligated to explore and present creative hybrid or third-path route solutions — such as partial alignments that capture some travel time savings while avoiding the farmhouse footprint, or design modifications that reduce the farmhouse impact — rather than limiting analysis to a binary choice between the shortest route (requiring full condemnation) and longer routes (forgoing all time savings), consistent with the engineer's role as a trustee applying full professional knowledge and creativity to the client's problem." ; proeth:sourcetext "Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip." ; proeth:temporalscope "During route analysis and before submitting route recommendation to the state client" ; proeth:textreferences "Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.", "However, in order to build the shortest route, the state would be required to address the impact to a historic family farmhouse that has existed for over 100 years on the land required for the route." ; proeth:wasattributedto "Case 123 Extraction" ; prov:generatedAtTime "2026-02-28T00:14:43.750401"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 123 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
123
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-28T00:00:48.240876+00:00
First case
123
Generated
2026-02-28T00:00:48.240876+00:00
Attributed to
Case 123 Extraction
Generated
2026-02-28T00:14:43.750401
Generated by
ProEthica Case 123 Extraction