Complete Comparative Design Alternatives Presentation Engineer A Route
O · Obligation
Individual
http://proethica.org/ontology/case/123#Complete_Comparative_Design_Alternatives_Presentation_Engineer_A_Route
Properties
Instance of
CompleteComparativeDesignAlternativesPresentationObligation
http://proethica.org/ontology/intermediate#CompleteComparativeDesignAlternativesPresentationObligation
Case context
Engineer A has identified at minimum two categories of route alternatives: the shortest route (saving 30 minutes but requiring displacement of a historic farmhouse) and longer routes (avoiding the farmhouse but adding travel time). Both must be presented completely and objectively.
Compliance status
unclear
Confidence
0.87
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to present each workable route alternative completely and objectively to the state client decision-makers, including all advantages, disadvantages, long-term risks, cost tradeoffs, historic resource implications, and disproportionate impact considerations — specifically including the travel time savings of the shortest route, the historic property displacement consequences, and the availability of longer routes avoiding the farmhouse — so that decision-makers can make a fully informed choice among the alternatives.
Temporal scope
As part of the route specification deliverable under the state contract
Source Evidence
Source text
Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.
Text references
Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.
However, in order to build the shortest route, the state would be required to address the impact to a historic family farmhouse that has existed for over 100 years on the land required for the route.
TTL
@prefix case123: <http://proethica.org/ontology/case/123#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case123:Complete_Comparative_Design_Alternatives_Presentation_Engineer_A_Route a proeth:CompleteComparativeDesignAlternativesPresentationObligation,
owl:NamedIndividual ;
rdfs:label "Complete Comparative Design Alternatives Presentation Engineer A Route" ;
proeth-core:competesWith case123:Engineer_A_Waterfront_Hearing_Relevance_Pertinence_Judgment,
case123:Faithful_Agent_Route_Specification_Engineer_A_JKL_State_Contract ;
proeth-core:prevailsOver case123:Faithful_Agent_Route_Specification_Engineer_A_JKL_State_Contract ;
proeth:casecontext "Engineer A has identified at minimum two categories of route alternatives: the shortest route (saving 30 minutes but requiring displacement of a historic farmhouse) and longer routes (avoiding the farmhouse but adding travel time). Both must be presented completely and objectively." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.87" ;
proeth:derivedFromPrinciple case123:Completeness_Advisory_Obligation_Invoked_By_Engineer_A_Route_Alternatives,
case123:Objectivity_Invoked_By_Engineer_A_Route_Evaluation ;
proeth:discoveredincase "123" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-28T00:00:48.240876+00:00" ;
proeth:firstdiscoveredincase "123" ;
proeth:generatedattime "2026-02-28T00:00:48.240876+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Complete Comparative Design Alternatives Presentation Obligation" ;
proeth:obligationstatement "Engineer A is obligated to present each workable route alternative completely and objectively to the state client decision-makers, including all advantages, disadvantages, long-term risks, cost tradeoffs, historic resource implications, and disproportionate impact considerations — specifically including the travel time savings of the shortest route, the historic property displacement consequences, and the availability of longer routes avoiding the farmhouse — so that decision-makers can make a fully informed choice among the alternatives." ;
proeth:sourcetext "Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip." ;
proeth:temporalscope "As part of the route specification deliverable under the state contract" ;
proeth:textreferences "Engineer A determines that the shortest workable route would save approximately 30 minutes from what would otherwise be a two-hour trip.",
"However, in order to build the shortest route, the state would be required to address the impact to a historic family farmhouse that has existed for over 100 years on the land required for the route." ;
proeth:wasattributedto "Case 123 Extraction" ;
prov:generatedAtTime "2026-02-28T00:14:43.763198"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 123 Extraction" .
Metadata
Extraction details
Discovered in case
123
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-28T00:00:48.240876+00:00
First case
123
Generated
2026-02-28T00:00:48.240876+00:00
Attributed to
Case 123 Extraction
Generated
2026-02-28T00:14:43.763198
Generated by
ProEthica Case 123 Extraction