Case context
Engineer B delivered a rural roadway design to County A that contained significant deficiencies including miscalculated quantities, requiring extensive field revisions during construction and causing the County significant time and effort to resolve.
Compliance status
unmet
Confidence
0.92
Importance
high
Obligated party
Engineer B
Obligation statement
Engineer B was obligated to act as a faithful agent and trustee for County A, serving the County's interests by delivering a competent and accurate rural roadway design — an obligation violated by delivering a deficient design with miscalculated quantities and significant errors.
Temporal scope
Throughout the design engagement and delivery of the design product
Source Evidence
Source text
A significant number of field revisions were necessary and estimated quantities of work had been miscalculated, resulting in excessive time and effort for the County to resolve.

Text references
A significant number of field revisions were necessary and estimated quantities of work had been miscalculated, resulting in excessive time and effort for the County to resolve.
Engineer B did admit that the problems encountered were outside the firm's understanding of proper design.
The County grew increasingly frustrated with the quality of work provided by Engineer B.
TTL
@prefix case12: <http://proethica.org/ontology/case/12#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case12:Engineer_B_Faithful_Agent_Obligation_County_A_Roadway_Design a proeth:FaithfulAgentObligation, owl:NamedIndividual ; rdfs:label "Engineer B Faithful Agent Obligation County A Roadway Design" ; proeth-core:competesWith case12:Engineer_B_Economic_Pressure_Non-Subordination_Rural_Roadway_Contract ; proeth-core:defeasibleUnder case12:Engineer_B_Rural_Highway_Design_Domain_Incompetence ; proeth:casecontext "Engineer B delivered a rural roadway design to County A that contained significant deficiencies including miscalculated quantities, requiring extensive field revisions during construction and causing the County significant time and effort to resolve." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.92" ; proeth:derivedFromPrinciple case12:Client_Loyalty_Violated_By_Engineer_B_Deficient_Design_Delivery ; proeth:discoveredincase "12" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-24T19:51:16.845764+00:00" ; proeth:firstdiscoveredincase "12" ; proeth:generatedattime "2026-02-24T19:51:16.845764+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer B" ; proeth:obligationclass "Faithful Agent Obligation" ; proeth:obligationstatement "Engineer B was obligated to act as a faithful agent and trustee for County A, serving the County's interests by delivering a competent and accurate rural roadway design — an obligation violated by delivering a deficient design with miscalculated quantities and significant errors." ; proeth:sourcetext "A significant number of field revisions were necessary and estimated quantities of work had been miscalculated, resulting in excessive time and effort for the County to resolve." ; proeth:temporalscope "Throughout the design engagement and delivery of the design product" ; proeth:textreferences "A significant number of field revisions were necessary and estimated quantities of work had been miscalculated, resulting in excessive time and effort for the County to resolve.", "Engineer B did admit that the problems encountered were outside the firm's understanding of proper design.", "The County grew increasingly frustrated with the quality of work provided by Engineer B." ; proeth:wasattributedto "Case 12 Extraction" ; prov:generatedAtTime "2026-02-24T20:03:54.186297"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 12 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 23:35
Discovered in case
12
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-24T19:51:16.845764+00:00
First case
12
Generated
2026-02-24T19:51:16.845764+00:00
Attributed to
Case 12 Extraction
Generated
2026-02-24T20:03:54.186297
Generated by
ProEthica Case 12 Extraction