Engineer B Deficient Design Harm Materialized - Highway
S · State
Individual
http://proethica.org/ontology/case/12#Engineer_B_Deficient_Design_Harm_Materialized_-_Highway
Properties
Instance of
DeficientDesignHarmMaterializedState
http://proethica.org/ontology/intermediate#DeficientDesignHarmMaterializedState
Active period
From construction commencement through identification of design-caused problems
Affected parties
Client
Construction contractors
Engineer B
Public road users
Confidence
0.88
Importance
high
Subject
Engineer B's rural highway design and resulting construction problems
Terminated by
Not specified; construction problems ongoing at time of case analysis
Triggering event
Rural highway design produced by Engineer B (lacking roadway competence) entered construction and produced concrete adverse consequences
Urgency level
high
Source Evidence
Source text
The problems that occurred during construction would have been avoided if the design met standards
Text references
The problems that occurred during construction would have been avoided if the design met standards
TTL
@prefix case12: <http://proethica.org/ontology/case/12#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case12:Engineer_B_Deficient_Design_Harm_Materialized_-_Highway a proeth:DeficientDesignHarmMaterializedState,
owl:NamedIndividual ;
rdfs:label "Engineer B Deficient Design Harm Materialized - Highway" ;
proeth:activeperiod "From construction commencement through identification of design-caused problems" ;
proeth:affectedparties "Client",
"Construction contractors",
"Engineer B",
"Public road users" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.88" ;
proeth:discoveredincase "12" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-24T19:48:00.422063+00:00" ;
proeth:firstdiscoveredincase "12" ;
proeth:generatedattime "2026-02-24T19:48:00.422063+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "The problems that occurred during construction would have been avoided if the design met standards" ;
proeth:stateclass "Deficient Design Harm Materialized State" ;
proeth:subject "Engineer B's rural highway design and resulting construction problems" ;
proeth:terminatedby "Not specified; construction problems ongoing at time of case analysis" ;
proeth:textreferences "The problems that occurred during construction would have been avoided if the design met standards" ;
proeth:triggeringevent "Rural highway design produced by Engineer B (lacking roadway competence) entered construction and produced concrete adverse consequences" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 12 Extraction" ;
prov:generatedAtTime "2026-02-24T20:03:54.183662"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 12 Extraction" .
Metadata
Extraction details
Discovered in case
12
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-24T19:48:00.422063+00:00
First case
12
Generated
2026-02-24T19:48:00.422063+00:00
Attributed to
Case 12 Extraction
Generated
2026-02-24T20:03:54.183662
Generated by
ProEthica Case 12 Extraction