Engineer B Competence Misrepresentation - Highway Contract

S · State Individual
http://proethica.org/ontology/case/12#Engineer_B_Competence_Misrepresentation_-_Highway_Contract
Properties
Instance of
CompetenceMisrepresentationtoClientState
http://proethica.org/ontology/intermediate#CompetenceMisrepresentationtoClientState
Active period
From bidding through contract execution
Affected parties
Client
Engineer B
Public road users
Confidence
0.85
Importance
high
Subject
Engineer B's representation of capability to perform rural highway design services
Terminated by
Construction problems revealed actual competence deficiency
Triggering event
Engineer B bid on and accepted rural highway design contract implicitly representing competence in roadway design
Urgency level
high
Source Evidence
Source text
Engineer B, as a water and wastewater engineer without identified significant roadway design skills, did not possess the competence to perform the rural highway design services

Text references
Engineer B did not meet this standard when bidding and accepting a contract involving work for which the firm did not have adequate competence
Engineer B, as a water and wastewater engineer without identified significant roadway design skills, did not possess the competence to perform the rural highway design services
TTL
@prefix case12: <http://proethica.org/ontology/case/12#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case12:Engineer_B_Competence_Misrepresentation_-_Highway_Contract a proeth:CompetenceMisrepresentationtoClientState, owl:NamedIndividual ; rdfs:label "Engineer B Competence Misrepresentation - Highway Contract" ; proeth:activeperiod "From bidding through contract execution" ; proeth:affectedparties "Client", "Engineer B", "Public road users" ; proeth:conceptCategory "State" ; proeth:confidence "0.85" ; proeth:discoveredincase "12" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-24T19:48:00.422063+00:00" ; proeth:firstdiscoveredincase "12" ; proeth:generatedattime "2026-02-24T19:48:00.422063+00:00" ; proeth:importance "high" ; proeth:sourcetext "Engineer B, as a water and wastewater engineer without identified significant roadway design skills, did not possess the competence to perform the rural highway design services" ; proeth:stateclass "Competence Misrepresentation to Client State" ; proeth:subject "Engineer B's representation of capability to perform rural highway design services" ; proeth:terminatedby "Construction problems revealed actual competence deficiency" ; proeth:textreferences "Engineer B did not meet this standard when bidding and accepting a contract involving work for which the firm did not have adequate competence", "Engineer B, as a water and wastewater engineer without identified significant roadway design skills, did not possess the competence to perform the rural highway design services" ; proeth:triggeringevent "Engineer B bid on and accepted rural highway design contract implicitly representing competence in roadway design" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 12 Extraction" ; prov:generatedAtTime "2026-02-24T20:03:54.183981"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 12 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 23:35
Discovered in case
12
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-24T19:48:00.422063+00:00
First case
12
Generated
2026-02-24T19:48:00.422063+00:00
Attributed to
Case 12 Extraction
Generated
2026-02-24T20:03:54.183981
Generated by
ProEthica Case 12 Extraction