DP5
Individual
http://proethica.org/ontology/case/12#DP5
Properties
Instance of
Decision Point Id
DP5
Decision question
Should Engineer B affix a professional seal to the completed rural roadway design documents and, once construction problems emerge, proactively disclose the design deficiencies to County A at the earliest moment rather than waiting for a formal County-initiated meeting?
Focus
Engineer B's completion and sealing of the rural roadway design documents, and the subsequent obligation to proactively disclose design deficiencies to County A once construction problems emerged, rather than waiting for a County-convened meeting
Option1
Affix the professional seal to the completed roadway design documents and wait for County A to convene a formal meeting before acknowledging design deficiencies
Option2
Refuse to affix the professional seal to design documents produced outside the firm's domain competence and immediately disclose the competence limitation to County A
Option3
Affix the professional seal but proactively disclose emerging construction deficiencies to County A at the earliest moment problems become apparent, without waiting for a County-initiated meeting
Role
Engineer B Rural Roadway Design Engineer
TTL
@prefix case12: <http://proethica.org/ontology/case/12#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-cases: <http://proethica.org/ontology/cases#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case12:DP5 a proeth-cases:DecisionPoint,
owl:NamedIndividual ;
rdfs:label "DP5" ;
proeth:decisionPointId "DP5" ;
proeth:decisionQuestion "Should Engineer B affix a professional seal to the completed rural roadway design documents and, once construction problems emerge, proactively disclose the design deficiencies to County A at the earliest moment rather than waiting for a formal County-initiated meeting?" ;
proeth:focus "Engineer B's completion and sealing of the rural roadway design documents, and the subsequent obligation to proactively disclose design deficiencies to County A once construction problems emerged, rather than waiting for a County-convened meeting" ;
proeth:option1 "Affix the professional seal to the completed roadway design documents and wait for County A to convene a formal meeting before acknowledging design deficiencies" ;
proeth:option2 "Refuse to affix the professional seal to design documents produced outside the firm's domain competence and immediately disclose the competence limitation to County A" ;
proeth:option3 "Affix the professional seal but proactively disclose emerging construction deficiencies to County A at the earliest moment problems become apparent, without waiting for a County-initiated meeting" ;
proeth:roleLabel "Engineer B Rural Roadway Design Engineer" ;
prov:generatedAtTime "2026-02-24T20:17:29.714631"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 12 Extraction" .
Metadata
Extraction details
Generated
2026-02-24T20:17:29.714631
Generated by
ProEthica Case 12 Extraction