State Power Commission PE Fact-Grounded Low-Dams Opinion
O · Obligation
Individual
http://proethica.org/ontology/case/114#State_Power_Commission_PE_Fact-Grounded_Low-Dams_Opinion
Properties
Instance of
Fact-GroundedTechnicalOpinionObligation
http://proethica.org/ontology/intermediate#Fact-GroundedTechnicalOpinionObligation
Case context
Legislative hearing on water supply, flood control, and electric power production; PE submits voluminous engineering data supporting the series-of-low-dams conclusion.
Compliance status
met
Confidence
0.93
Importance
high
Obligated party
State Power Commission PE (Legislative Witness)
Obligation statement
The state power commission PE was obligated to ground the low-dams engineering position in established facts and completed professional analysis, submitting complete engineering data to the legislative committee rather than unsupported advocacy.
Temporal scope
At the time of legislative testimony and data submission
Relationships
competesWith
State Power Commission PE Legislative Witness — Estimate-Based Indeterminacy Acknowledgment
defeasibleUnder
Water-Power Complex Indeterminate Fact or Estimation
derivedFromPrinciple
Objectivity Obligation — Data-Grounded Legislative Testimony
Source Evidence
Source text
engineering studies by him and his professional colleagues indicate the most efficient solution from an engineering standpoint is a series of low dams
Text references
Each engineering witness submits voluminous engineering data in support of his position
engineering studies by him and his professional colleagues indicate the most efficient solution from an engineering standpoint is a series of low dams
TTL
@prefix case114: <http://proethica.org/ontology/case/114#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case114:State_Power_Commission_PE_Fact-Grounded_Low-Dams_Opinion a proeth:Fact-GroundedTechnicalOpinionObligation,
owl:NamedIndividual ;
rdfs:label "State Power Commission PE Fact-Grounded Low-Dams Opinion" ;
proeth-core:competesWith <http://proethica.org/ontology/case/114#State_Power_Commission_PE_Legislative_Witness_—_Estimate-Based_Indeterminacy_Acknowledgment> ;
proeth-core:defeasibleUnder case114:Water-Power_Complex_Indeterminate_Factor_Estimation ;
proeth:casecontext "Legislative hearing on water supply, flood control, and electric power production; PE submits voluminous engineering data supporting the series-of-low-dams conclusion." ;
proeth:compliancestatus "met" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.93" ;
proeth:derivedFromPrinciple <http://proethica.org/ontology/case/114#Objectivity_Obligation_—_Data-Grounded_Legislative_Testimony> ;
proeth:discoveredincase "114" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-02T15:22:08.323408+00:00" ;
proeth:firstdiscoveredincase "114" ;
proeth:generatedattime "2026-03-02T15:22:08.323408+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "State Power Commission PE (Legislative Witness)" ;
proeth:obligationclass "Fact-Grounded Technical Opinion Obligation" ;
proeth:obligationstatement "The state power commission PE was obligated to ground the low-dams engineering position in established facts and completed professional analysis, submitting complete engineering data to the legislative committee rather than unsupported advocacy." ;
proeth:sourcetext "engineering studies by him and his professional colleagues indicate the most efficient solution from an engineering standpoint is a series of low dams" ;
proeth:temporalscope "At the time of legislative testimony and data submission" ;
proeth:textreferences "Each engineering witness submits voluminous engineering data in support of his position",
"engineering studies by him and his professional colleagues indicate the most efficient solution from an engineering standpoint is a series of low dams" ;
proeth:wasattributedto "Case 114 Extraction" ;
prov:generatedAtTime "2026-03-02T15:38:37.736651"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 114 Extraction" .
Metadata
Extraction details
Discovered in case
114
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-02T15:22:08.323408+00:00
First case
114
Generated
2026-03-02T15:22:08.323408+00:00
Attributed to
Case 114 Extraction
Generated
2026-03-02T15:38:37.736651
Generated by
ProEthica Case 114 Extraction