State Power Commission PE Data Submission Completeness

O · Obligation Individual
http://proethica.org/ontology/case/114#State_Power_Commission_PE_Data_Submission_Completeness
Properties
Instance of
RetainedLegislativeWitnessEngineerData-SubmissionCompletenessObligation
http://proethica.org/ontology/intermediate#RetainedLegislativeWitnessEngineerData-SubmissionCompletenessObligation
Case context
State legislative committee hearing on water supply, flood control, and electric power production bills; PE submits engineering data supporting series of low dams.
Compliance status
met
Confidence
0.88
Importance
high
Obligated party
State Power Commission PE (Legislative Witness)
Obligation statement
The state power commission PE was obligated to submit voluminous and complete engineering data to the legislative committee in support of the low-dams position, ensuring the legislature had the full evidentiary basis for the engineering conclusion.
Temporal scope
At the time of legislative testimony
Source Evidence
Source text
Each engineering witness submits voluminous engineering data in support of his position

Text references
Each engineering witness submits voluminous engineering data in support of his position
TTL
@prefix case114: <http://proethica.org/ontology/case/114#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case114:State_Power_Commission_PE_Data_Submission_Completeness a proeth:RetainedLegislativeWitnessEngineerData-SubmissionCompletenessObligation, owl:NamedIndividual ; rdfs:label "State Power Commission PE Data Submission Completeness" ; proeth:casecontext "State legislative committee hearing on water supply, flood control, and electric power production bills; PE submits engineering data supporting series of low dams." ; proeth:compliancestatus "met" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.88" ; proeth:derivedFromPrinciple <http://proethica.org/ontology/case/114#Legislative_Hearing_Technical_Testimony_Objectivity_—_Dam_Configuration_Competing_Analyses>, <http://proethica.org/ontology/case/114#Objectivity_Obligation_—_Data-Grounded_Legislative_Testimony> ; proeth:discoveredincase "114" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-02T15:22:08.323408+00:00" ; proeth:firstdiscoveredincase "114" ; proeth:generatedattime "2026-03-02T15:22:08.323408+00:00" ; proeth:importance "high" ; proeth:obligatedparty "State Power Commission PE (Legislative Witness)" ; proeth:obligationclass "Retained Legislative Witness Engineer Data-Submission Completeness Obligation" ; proeth:obligationstatement "The state power commission PE was obligated to submit voluminous and complete engineering data to the legislative committee in support of the low-dams position, ensuring the legislature had the full evidentiary basis for the engineering conclusion." ; proeth:sourcetext "Each engineering witness submits voluminous engineering data in support of his position" ; proeth:temporalscope "At the time of legislative testimony" ; proeth:textreferences "Each engineering witness submits voluminous engineering data in support of his position" ; proeth:wasattributedto "Case 114 Extraction" ; prov:generatedAtTime "2026-03-02T15:38:37.736917"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 114 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
114
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-02T15:22:08.323408+00:00
First case
114
Generated
2026-03-02T15:22:08.323408+00:00
Attributed to
Case 114 Extraction
Generated
2026-03-02T15:38:37.736917
Generated by
ProEthica Case 114 Extraction