State Power Commission

R · Role Individual
http://proethica.org/ontology/case/114#State_Power_Commission
Definition

Public agency whose engineering position (low dams) is represented before the state legislature; retains or employs the testifying PE.

Properties
Instance of
StakeholderRole
http://proethica.org/ontology/intermediate#StakeholderRole
Attributes
entity_typeGovernment agency
jurisdictionState level
interestWater supply, flood control, and electric power policy
Confidence
0.85
Importance
medium
Relationships
typeemploys_or_retains
targetState Power Commission PE Legislative Witness
typestakeholder_in
targetState Legislature Hearings
Role category
public_responsibility
Source Evidence
Source text
A professional engineer representing the state power commission

Text references
A professional engineer representing the state power commission
TTL
@prefix case114: <http://proethica.org/ontology/case/114#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case114:State_Power_Commission a proeth:StakeholderRole, owl:NamedIndividual ; rdfs:label "State Power Commission" ; proeth:attributes "{'entity_type': 'Government agency', 'jurisdiction': 'State level', 'interest': 'Water supply, flood control, and electric power policy'}" ; proeth:caseinvolvement "Public agency whose engineering position (low dams) is represented before the state legislature; retains or employs the testifying PE." ; proeth:conceptCategory "Role" ; proeth:confidence "0.85" ; proeth:discoveredincase "114" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-02T15:15:25.989723+00:00" ; proeth:firstdiscoveredincase "114" ; proeth:generatedattime "2026-03-02T15:15:25.989723+00:00" ; proeth:importance "medium" ; proeth:relationships "{'type': 'employs_or_retains', 'target': 'State Power Commission PE Legislative Witness'}", "{'type': 'stakeholder_in', 'target': 'State Legislature Hearings'}" ; proeth:rolecategory "public_responsibility" ; proeth:roleclass "Stakeholder Role" ; proeth:sourcetext "A professional engineer representing the state power commission" ; proeth:textreferences "A professional engineer representing the state power commission" ; proeth:wasattributedto "Case 114 Extraction" ; prov:generatedAtTime "2026-03-02T15:38:37.730208"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 114 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
114
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-02T15:15:25.989723+00:00
First case
114
Generated
2026-03-02T15:15:25.989723+00:00
Attributed to
Case 114 Extraction
Generated
2026-03-02T15:38:37.730208
Generated by
ProEthica Case 114 Extraction