Private Power Company PE Honest Technical Disagreement Non-Violation
O · Obligation
Individual
http://proethica.org/ontology/case/114#Private_Power_Company_PE_Honest_Technical_Disagreement_Non-Violation
Properties
Instance of
HonestTechnicalDisagreementNon-Ethical-ViolationRecognitionObligation
http://proethica.org/ontology/intermediate#HonestTechnicalDisagreementNon-Ethical-ViolationRecognitionObligation
Case context
Two qualified PEs reach opposing engineering conclusions on the most efficient and economical method for water supply, flood control, and electric power production; the disagreement is genuine and data-supported on both sides.
Compliance status
met
Confidence
0.9
Importance
high
Obligated party
Ethics adjudicators reviewing the private power company PE's conduct
Obligation statement
Any ethics body reviewing the private power company PE's testimony must recognize that reaching a different technical conclusion (one high dam) from the same underlying engineering problem as the state power commission PE (series of low dams) does not constitute an ethical violation — honest professional disagreement between qualified engineers is a normal and legitimate feature of engineering practice.
Temporal scope
At any point of ethics review following the legislative testimony
Relationships
defeasibleUnder
Competing Low Dam vs. High Dam Design Approaches
derivedFromPrinciple
Honest Disagreement Permissibility — Low Dams vs. High Dam Engineering Positions
Source Evidence
Source text
The most efficient and economical method to achieve the desired result has been debated within the legislature and among the citizenry generally for several years
Text references
Another professional engineer, representing a private power company, testifies that his engineering analysis indicates a more effective and less expensive solution, producing the same results, by using one high dam
The most efficient and economical method to achieve the desired result has been debated within the legislature and among the citizenry generally for several years
TTL
@prefix case114: <http://proethica.org/ontology/case/114#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case114:Private_Power_Company_PE_Honest_Technical_Disagreement_Non-Violation a proeth:HonestTechnicalDisagreementNon-Ethical-ViolationRecognitionObligation,
owl:NamedIndividual ;
rdfs:label "Private Power Company PE Honest Technical Disagreement Non-Violation" ;
proeth-core:competesWith case114:Private_Power_Company_PE_Legislative_Testimony_Objectivity ;
proeth-core:defeasibleUnder case114:Competing_Low_Dam_vs._High_Dam_Design_Approaches ;
proeth:casecontext "Two qualified PEs reach opposing engineering conclusions on the most efficient and economical method for water supply, flood control, and electric power production; the disagreement is genuine and data-supported on both sides." ;
proeth:compliancestatus "met" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.9" ;
proeth:derivedFromPrinciple <http://proethica.org/ontology/case/114#Honest_Disagreement_Permissibility_—_Low_Dams_vs._High_Dam_Engineering_Positions> ;
proeth:discoveredincase "114" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-02T15:22:08.323408+00:00" ;
proeth:firstdiscoveredincase "114" ;
proeth:generatedattime "2026-03-02T15:22:08.323408+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Ethics adjudicators reviewing the private power company PE's conduct" ;
proeth:obligationclass "Honest Technical Disagreement Non-Ethical-Violation Recognition Obligation" ;
proeth:obligationstatement "Any ethics body reviewing the private power company PE's testimony must recognize that reaching a different technical conclusion (one high dam) from the same underlying engineering problem as the state power commission PE (series of low dams) does not constitute an ethical violation — honest professional disagreement between qualified engineers is a normal and legitimate feature of engineering practice." ;
proeth:sourcetext "The most efficient and economical method to achieve the desired result has been debated within the legislature and among the citizenry generally for several years" ;
proeth:temporalscope "At any point of ethics review following the legislative testimony" ;
proeth:textreferences "Another professional engineer, representing a private power company, testifies that his engineering analysis indicates a more effective and less expensive solution, producing the same results, by using one high dam",
"The most efficient and economical method to achieve the desired result has been debated within the legislature and among the citizenry generally for several years" ;
proeth:wasattributedto "Case 114 Extraction" ;
prov:generatedAtTime "2026-03-02T15:38:37.737750"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 114 Extraction" .
Metadata
Extraction details
Discovered in case
114
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-02T15:22:08.323408+00:00
First case
114
Generated
2026-03-02T15:22:08.323408+00:00
Attributed to
Case 114 Extraction
Generated
2026-03-02T15:38:37.737750
Generated by
ProEthica Case 114 Extraction