Private Power Company PE Competing Public Goods Balanced Advisory
O · Obligation
Individual
http://proethica.org/ontology/case/114#Private_Power_Company_PE_Competing_Public_Goods_Balanced_Advisory
Properties
Instance of
CompetingPublicGoodsBalancedAdvisoryDisclosureObligation
http://proethica.org/ontology/intermediate#CompetingPublicGoodsBalancedAdvisoryDisclosureObligation
Case context
Legislative hearing on bills involving water supply, flood control, and electric power production; the choice between one high dam and a series of low dams involves trade-offs across multiple public goods.
Compliance status
met
Confidence
0.84
Importance
medium
Obligated party
Private Power Company PE (Legislative Witness)
Obligation statement
The private power company PE was obligated to acknowledge and address the competing public goods at stake — water supply, flood control, and electric power production — in the legislative testimony, presenting the trade-offs between the high-dam and low-dams approaches completely and objectively so that the legislature could make an informed policy decision.
Temporal scope
During legislative testimony
Relationships
derivedFromPrinciple
Competing Public Goods Balancing — Water Supply Flood Control Power Production
Source Evidence
Source text
A state legislature has pending various bills involving water supply, flood control and production of electric power
Text references
A state legislature has pending various bills involving water supply, flood control and production of electric power
his engineering analysis indicates a more effective and less expensive solution, producing the same results, by using one high dam
TTL
@prefix case114: <http://proethica.org/ontology/case/114#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case114:Private_Power_Company_PE_Competing_Public_Goods_Balanced_Advisory a proeth:CompetingPublicGoodsBalancedAdvisoryDisclosureObligation,
owl:NamedIndividual ;
rdfs:label "Private Power Company PE Competing Public Goods Balanced Advisory" ;
proeth-core:competesWith case114:Private_Power_Company_PE_Legislative_Testimony_Objectivity ;
proeth:casecontext "Legislative hearing on bills involving water supply, flood control, and electric power production; the choice between one high dam and a series of low dams involves trade-offs across multiple public goods." ;
proeth:compliancestatus "met" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.84" ;
proeth:derivedFromPrinciple <http://proethica.org/ontology/case/114#Competing_Public_Goods_Balancing_—_Water_Supply_Flood_Control_Power_Production> ;
proeth:discoveredincase "114" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-02T15:22:08.323408+00:00" ;
proeth:firstdiscoveredincase "114" ;
proeth:generatedattime "2026-03-02T15:22:08.323408+00:00" ;
proeth:importance "medium" ;
proeth:obligatedparty "Private Power Company PE (Legislative Witness)" ;
proeth:obligationclass "Competing Public Goods Balanced Advisory Disclosure Obligation" ;
proeth:obligationstatement "The private power company PE was obligated to acknowledge and address the competing public goods at stake — water supply, flood control, and electric power production — in the legislative testimony, presenting the trade-offs between the high-dam and low-dams approaches completely and objectively so that the legislature could make an informed policy decision." ;
proeth:sourcetext "A state legislature has pending various bills involving water supply, flood control and production of electric power" ;
proeth:temporalscope "During legislative testimony" ;
proeth:textreferences "A state legislature has pending various bills involving water supply, flood control and production of electric power",
"his engineering analysis indicates a more effective and less expensive solution, producing the same results, by using one high dam" ;
proeth:wasattributedto "Case 114 Extraction" ;
prov:generatedAtTime "2026-03-02T15:38:37.738714"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 114 Extraction" .
Metadata
Extraction details
Discovered in case
114
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-02T15:22:08.323408+00:00
First case
114
Generated
2026-03-02T15:22:08.323408+00:00
Attributed to
Case 114 Extraction
Generated
2026-03-02T15:38:37.738714
Generated by
ProEthica Case 114 Extraction