Engineer B BER Case 09-6 Document Owner

R · Role Individual
http://proethica.org/ontology/case/111#Engineer_B_BER_Case_09-6_Document_Owner
Definition

Prepared, designed, and sealed design documents for an assigned scope of a shared project; had documents modified without knowledge or consent by Engineer A under management pressure.

Properties
Instance of
EngineerofRecordforSealedDocuments
http://proethica.org/ontology/intermediate#EngineerofRecordforSealedDocuments
Attributes
licenseProfessional Engineer
specialtyElectrical engineering
statusUnavailable when unauthorized modifications were made
Confidence
0.9
Importance
high
Relationships
typeemployee
targetEngineering Firm Management BER Case 09-6
typepeer
targetEngineer A BER Case 09-6 Document Modifier
Role category
provider_client
Source Evidence
Source text
Engineer B prepared, designed, and sealed the design documents for which she was responsible

Text references
Engineer A made minor changes to design documents prepared and revised by Engineer B without consulting Engineer B
Engineer B prepared, designed, and sealed the design documents for which she was responsible
when neither Engineer B nor immediate management was available
TTL
@prefix case111: <http://proethica.org/ontology/case/111#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case111:Engineer_B_BER_Case_09-6_Document_Owner a proeth:EngineerofRecordforSealedDocuments, owl:NamedIndividual ; rdfs:label "Engineer B BER Case 09-6 Document Owner" ; proeth:attributes "{'license': 'Professional Engineer', 'specialty': 'Electrical engineering', 'status': 'Unavailable when unauthorized modifications were made'}" ; proeth:caseinvolvement "Prepared, designed, and sealed design documents for an assigned scope of a shared project; had documents modified without knowledge or consent by Engineer A under management pressure." ; proeth:conceptCategory "Role" ; proeth:confidence "0.9" ; proeth:discoveredincase "111" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-28T00:06:35.385524+00:00" ; proeth:firstdiscoveredincase "111" ; proeth:generatedattime "2026-02-28T00:06:35.385524+00:00" ; proeth:importance "high" ; proeth:relationships "{'type': 'employee', 'target': 'Engineering Firm Management BER Case 09-6'}", "{'type': 'peer', 'target': 'Engineer A BER Case 09-6 Document Modifier'}" ; proeth:rolecategory "provider_client" ; proeth:roleclass "Engineer of Record for Sealed Documents" ; proeth:sourcetext "Engineer B prepared, designed, and sealed the design documents for which she was responsible" ; proeth:textreferences "Engineer A made minor changes to design documents prepared and revised by Engineer B without consulting Engineer B", "Engineer B prepared, designed, and sealed the design documents for which she was responsible", "when neither Engineer B nor immediate management was available" ; proeth:wasattributedto "Case 111 Extraction" ; prov:generatedAtTime "2026-02-28T00:24:48.288352"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 111 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
111
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-28T00:06:35.385524+00:00
First case
111
Generated
2026-02-28T00:06:35.385524+00:00
Attributed to
Case 111 Extraction
Generated
2026-02-28T00:24:48.288352
Generated by
ProEthica Case 111 Extraction