Document title
NSPE Board of Ethical Review Case 86-2
Importance
high
Used by
NSPE Board of Ethical Review in analogical reasoning about the present case
Used in context
Cited as precedent establishing that it is unethical for an engineer to seal plans that have not been prepared by him or that he had not checked and reviewed in detail, grounding the principle of responsible charge and the integrity of the sealing process
Version
1986
Source Evidence
Source text
In BER Case 86-2, the Chief Engineer within a large engineering firm affixed his seal to some of the plans prepared by licensed engineers working under his general direction
Text references
In BER Case 86-2, the Chief Engineer within a large engineering firm affixed his seal to some of the plans prepared by licensed engineers working under his general direction
The Board concluded that it was unethical for the Chief Engineer to seal plans that have not been prepared by him, or that he had not checked and reviewed in detail
TTL
@prefix case111: <http://proethica.org/ontology/case/111#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case111:BER_Case_86-2 a proeth:BERCasePrecedent,
owl:NamedIndividual ;
rdfs:label "BER_Case_86-2" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.99" ;
proeth:createdby "NSPE Board of Ethical Review" ;
proeth:discoveredincase "111" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:documenttitle "NSPE Board of Ethical Review Case 86-2" ;
proeth:firstdiscoveredat "2026-02-28T00:06:22.441407+00:00" ;
proeth:firstdiscoveredincase "111" ;
proeth:generatedattime "2026-02-28T00:06:22.441407+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "BER Case Precedent" ;
proeth:sourcetext "In BER Case 86-2, the Chief Engineer within a large engineering firm affixed his seal to some of the plans prepared by licensed engineers working under his general direction" ;
proeth:textreferences "In BER Case 86-2, the Chief Engineer within a large engineering firm affixed his seal to some of the plans prepared by licensed engineers working under his general direction",
"The Board concluded that it was unethical for the Chief Engineer to seal plans that have not been prepared by him, or that he had not checked and reviewed in detail" ;
proeth:usedby "NSPE Board of Ethical Review in analogical reasoning about the present case" ;
proeth:usedincontext "Cited as precedent establishing that it is unethical for an engineer to seal plans that have not been prepared by him or that he had not checked and reviewed in detail, grounding the principle of responsible charge and the integrity of the sealing process" ;
proeth:version "1986" ;
proeth:wasattributedto "Case 111 Extraction" ;
prov:generatedAtTime "2026-02-28T00:24:48.301238"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 111 Extraction" .
Metadata
Extraction details
Discovered in case
111
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-28T00:06:22.441407+00:00
First case
111
Generated
2026-02-28T00:06:22.441407+00:00
Attributed to
Case 111 Extraction
Generated
2026-02-28T00:24:48.301238
Generated by
ProEthica Case 111 Extraction