Subdivision Stormwater Regulatory Non-Compliance
S · State
Individual
http://proethica.org/ontology/case/11#Subdivision_Stormwater_Regulatory_Non-Compliance
Properties
Instance of
RegulatoryStandardExceedanceConfirmedState
http://proethica.org/ontology/intermediate#RegulatoryStandardExceedanceConfirmedState
Active period
From completion of subdivision construction through independent IBM review findings and ongoing
Affected parties
City C
City Engineer J
Firm BWJ
Neighboring property owners
Principal Engineer R
Confidence
0.92
Importance
high
Subject
Firm BWJ's subdivision stormwater design for City C subdivision
Terminated by
Not yet terminated — regulatory non-compliance remains unresolved in the facts presented
Triggering event
Firm IBM's independent modeling confirmed post-development 25-year storm runoff flows substantially exceed pre-development conditions, in violation of City C subdivision regulations
Urgency level
high
Source Evidence
Source text
City C's subdivision regulations require that post-development 25-year recurrence interval peak stormwater flows must be equal to or less than pre-development conditions.
Text references
City C's subdivision regulations require that post-development 25-year recurrence interval peak stormwater flows must be equal to or less than pre-development conditions.
Firm IBM found storm runoff flows to be substantially larger for the 25-year, two-hour storm event after the subdivision was completed
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case11:Subdivision_Stormwater_Regulatory_Non-Compliance a proeth:RegulatoryStandardExceedanceConfirmedState,
owl:NamedIndividual ;
rdfs:label "Subdivision Stormwater Regulatory Non-Compliance" ;
proeth:activeperiod "From completion of subdivision construction through independent IBM review findings and ongoing" ;
proeth:affectedparties "City C",
"City Engineer J",
"Firm BWJ",
"Neighboring property owners",
"Principal Engineer R" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.92" ;
proeth:discoveredincase "11" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-24T20:35:46.035088+00:00" ;
proeth:firstdiscoveredincase "11" ;
proeth:generatedattime "2026-02-24T20:35:46.035088+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "City C's subdivision regulations require that post-development 25-year recurrence interval peak stormwater flows must be equal to or less than pre-development conditions." ;
proeth:stateclass "Regulatory Standard Exceedance Confirmed State" ;
proeth:subject "Firm BWJ's subdivision stormwater design for City C subdivision" ;
proeth:terminatedby "Not yet terminated — regulatory non-compliance remains unresolved in the facts presented" ;
proeth:textreferences "City C's subdivision regulations require that post-development 25-year recurrence interval peak stormwater flows must be equal to or less than pre-development conditions.",
"Firm IBM found storm runoff flows to be substantially larger for the 25-year, two-hour storm event after the subdivision was completed" ;
proeth:triggeringevent "Firm IBM's independent modeling confirmed post-development 25-year storm runoff flows substantially exceed pre-development conditions, in violation of City C subdivision regulations" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 11 Extraction" ;
prov:generatedAtTime "2026-02-24T20:54:41.750354"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Extraction details
Discovered in case
11
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-24T20:35:46.035088+00:00
First case
11
Generated
2026-02-24T20:35:46.035088+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.750354
Generated by
ProEthica Case 11 Extraction