Regulatory Compliance State — City C Subdivision Stormwater
S · State
Individual
http://proethica.org/ontology/case/11#Regulatory_Compliance_State_—_City_C_Subdivision_Stormwater
Properties
Instance of
Active period
From project inception through completion and post-construction review
Affected parties
City C
City Engineer J
Firm BWJ
Principal Engineer R
Confidence
0.91
Importance
high
Subject
Firm BWJ's subdivision design obligations under City C subdivision regulations
Terminated by
Not yet terminated — compliance status is actively contested following IBM findings
Triggering event
City C subdivision regulations establishing quantitative stormwater performance standard applicable to the subdivision design
Urgency level
high
Source Evidence
Source text
City C's subdivision regulations require that post-development 25-year recurrence interval peak stormwater flows must be equal to or less than pre-development conditions.
Text references
City C's subdivision regulations require that post-development 25-year recurrence interval peak stormwater flows must be equal to or less than pre-development conditions.
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
<http://proethica.org/ontology/case/11#Regulatory_Compliance_State_—_City_C_Subdivision_Stormwater> a proeth:RegulatoryComplianceState,
owl:NamedIndividual ;
rdfs:label "Regulatory Compliance State — City C Subdivision Stormwater" ;
proeth:activeperiod "From project inception through completion and post-construction review" ;
proeth:affectedparties "City C",
"City Engineer J",
"Firm BWJ",
"Principal Engineer R" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.91" ;
proeth:discoveredincase "11" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-24T20:35:46.035088+00:00" ;
proeth:firstdiscoveredincase "11" ;
proeth:generatedattime "2026-02-24T20:35:46.035088+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "City C's subdivision regulations require that post-development 25-year recurrence interval peak stormwater flows must be equal to or less than pre-development conditions." ;
proeth:stateclass "Regulatory Compliance State" ;
proeth:subject "Firm BWJ's subdivision design obligations under City C subdivision regulations" ;
proeth:terminatedby "Not yet terminated — compliance status is actively contested following IBM findings" ;
proeth:textreferences "City C's subdivision regulations require that post-development 25-year recurrence interval peak stormwater flows must be equal to or less than pre-development conditions." ;
proeth:triggeringevent "City C subdivision regulations establishing quantitative stormwater performance standard applicable to the subdivision design" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 11 Extraction" ;
prov:generatedAtTime "2026-02-24T20:54:41.751353"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Extraction details
Discovered in case
11
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-24T20:35:46.035088+00:00
First case
11
Generated
2026-02-24T20:35:46.035088+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.751353
Generated by
ProEthica Case 11 Extraction