Post-Subdivision Flooding Harm to Neighboring Properties
S · State
Individual
http://proethica.org/ontology/case/11#Post-Subdivision_Flooding_Harm_to_Neighboring_Properties
Properties
Instance of
Post-ProjectHarmMaterializedState
http://proethica.org/ontology/intermediate#Post-ProjectHarmMaterializedState
Active period
From completion of subdivision construction through ongoing flooding complaints and third-party review
Affected parties
City C
City Engineer J
Firm BWJ
Neighboring property owners
Principal Engineer R
Confidence
0.91
Importance
high
Subject
Completed subdivision design by Firm BWJ under Principal Engineer R
Terminated by
Not yet terminated — harm and investigation are ongoing in the facts presented
Triggering event
Properties in the vicinity of the completed subdivision experienced flooding causing water damage to homes
Urgency level
high
Source Evidence
Source text
After the subdivision is completed, properties in the vicinity of the subdivision experience flooding.
Text references
After the subdivision is completed, properties in the vicinity of the subdivision experience flooding.
Property owners complain that the flooding damage caused water damage to their homes
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case11:Post-Subdivision_Flooding_Harm_to_Neighboring_Properties a proeth:Post-ProjectHarmMaterializedState,
owl:NamedIndividual ;
rdfs:label "Post-Subdivision Flooding Harm to Neighboring Properties" ;
proeth:activeperiod "From completion of subdivision construction through ongoing flooding complaints and third-party review" ;
proeth:affectedparties "City C",
"City Engineer J",
"Firm BWJ",
"Neighboring property owners",
"Principal Engineer R" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.91" ;
proeth:discoveredincase "11" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-24T20:35:46.035088+00:00" ;
proeth:firstdiscoveredincase "11" ;
proeth:generatedattime "2026-02-24T20:35:46.035088+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "After the subdivision is completed, properties in the vicinity of the subdivision experience flooding." ;
proeth:stateclass "Post-Project Harm Materialized State" ;
proeth:subject "Completed subdivision design by Firm BWJ under Principal Engineer R" ;
proeth:terminatedby "Not yet terminated — harm and investigation are ongoing in the facts presented" ;
proeth:textreferences "After the subdivision is completed, properties in the vicinity of the subdivision experience flooding.",
"Property owners complain that the flooding damage caused water damage to their homes" ;
proeth:triggeringevent "Properties in the vicinity of the completed subdivision experienced flooding causing water damage to homes" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 11 Extraction" ;
prov:generatedAtTime "2026-02-24T20:54:41.750531"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Extraction details
Discovered in case
11
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-24T20:35:46.035088+00:00
First case
11
Generated
2026-02-24T20:35:46.035088+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.750531
Generated by
ProEthica Case 11 Extraction