IBM Independent Stormwater Modeling and Analysis

Rs · Resource Individual
http://proethica.org/ontology/case/11#IBM_Independent_Stormwater_Modeling_and_Analysis
Properties
Instance of
IndependentEngineeringReviewStandard
http://proethica.org/ontology/intermediate#IndependentEngineeringReviewStandard
Confidence
0.92
Created by
Firm IBM (independent engineering firm)
Document title
Firm IBM Third-Party Independent Engineering Review of City C Subdivision Stormwater Design
Importance
high
Used by
City C, property owners, ethical review of Firm BWJ's design adequacy
Used in context
Third-party independent engineering review commissioned by City C following flooding complaints, using hydrological modeling to assess whether BWJ's design met the 25-year recurrence interval standard. Findings revealed substantially larger post-development runoff flows and insufficient culvert capacity.
Version
Post-construction review
Source Evidence
Source text
City C engaged a third-party engineering firm (IBM) to review the subdivision design

Text references
After performing independent modeling and analysis, Firm IBM found storm runoff flows to be substantially larger for the 25-year, two-hour storm event after the subdivision was completed
City C engaged a third-party engineering firm (IBM) to review the subdivision design
One of the complaining property owner's driveway culverts was determined to have insufficient capacity for a 25-year storm event
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case11:IBM_Independent_Stormwater_Modeling_and_Analysis a proeth:IndependentEngineeringReviewStandard, owl:NamedIndividual ; rdfs:label "IBM Independent Stormwater Modeling and Analysis" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.92" ; proeth:createdby "Firm IBM (independent engineering firm)" ; proeth:discoveredincase "11" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:documenttitle "Firm IBM Third-Party Independent Engineering Review of City C Subdivision Stormwater Design" ; proeth:firstdiscoveredat "2026-02-24T20:35:16.956825+00:00" ; proeth:firstdiscoveredincase "11" ; proeth:generatedattime "2026-02-24T20:35:16.956825+00:00" ; proeth:importance "high" ; proeth:resourceclass "Independent Engineering Review Standard" ; proeth:sourcetext "City C engaged a third-party engineering firm (IBM) to review the subdivision design" ; proeth:textreferences "After performing independent modeling and analysis, Firm IBM found storm runoff flows to be substantially larger for the 25-year, two-hour storm event after the subdivision was completed", "City C engaged a third-party engineering firm (IBM) to review the subdivision design", "One of the complaining property owner's driveway culverts was determined to have insufficient capacity for a 25-year storm event" ; proeth:usedby "City C, property owners, ethical review of Firm BWJ's design adequacy" ; proeth:usedincontext "Third-party independent engineering review commissioned by City C following flooding complaints, using hydrological modeling to assess whether BWJ's design met the 25-year recurrence interval standard. Findings revealed substantially larger post-development runoff flows and insufficient culvert capacity." ; proeth:version "Post-construction review" ; proeth:wasattributedto "Case 11 Extraction" ; prov:generatedAtTime "2026-02-24T20:54:41.749005"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
11
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-24T20:35:16.956825+00:00
First case
11
Generated
2026-02-24T20:35:16.956825+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.749005
Generated by
ProEthica Case 11 Extraction