IBM Independent Stormwater Modeling and Analysis
Rs · Resource
Individual
http://proethica.org/ontology/case/11#IBM_Independent_Stormwater_Modeling_and_Analysis
Properties
Instance of
IndependentEngineeringReviewStandard
http://proethica.org/ontology/intermediate#IndependentEngineeringReviewStandard
Confidence
0.92
Created by
Firm IBM (independent engineering firm)
Document title
Firm IBM Third-Party Independent Engineering Review of City C Subdivision Stormwater Design
Importance
high
Used by
City C, property owners, ethical review of Firm BWJ's design adequacy
Used in context
Third-party independent engineering review commissioned by City C following flooding complaints, using hydrological modeling to assess whether BWJ's design met the 25-year recurrence interval standard. Findings revealed substantially larger post-development runoff flows and insufficient culvert capacity.
Version
Post-construction review
Source Evidence
Source text
City C engaged a third-party engineering firm (IBM) to review the subdivision design
Text references
After performing independent modeling and analysis, Firm IBM found storm runoff flows to be substantially larger for the 25-year, two-hour storm event after the subdivision was completed
City C engaged a third-party engineering firm (IBM) to review the subdivision design
One of the complaining property owner's driveway culverts was determined to have insufficient capacity for a 25-year storm event
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case11:IBM_Independent_Stormwater_Modeling_and_Analysis a proeth:IndependentEngineeringReviewStandard,
owl:NamedIndividual ;
rdfs:label "IBM Independent Stormwater Modeling and Analysis" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.92" ;
proeth:createdby "Firm IBM (independent engineering firm)" ;
proeth:discoveredincase "11" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:documenttitle "Firm IBM Third-Party Independent Engineering Review of City C Subdivision Stormwater Design" ;
proeth:firstdiscoveredat "2026-02-24T20:35:16.956825+00:00" ;
proeth:firstdiscoveredincase "11" ;
proeth:generatedattime "2026-02-24T20:35:16.956825+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Independent Engineering Review Standard" ;
proeth:sourcetext "City C engaged a third-party engineering firm (IBM) to review the subdivision design" ;
proeth:textreferences "After performing independent modeling and analysis, Firm IBM found storm runoff flows to be substantially larger for the 25-year, two-hour storm event after the subdivision was completed",
"City C engaged a third-party engineering firm (IBM) to review the subdivision design",
"One of the complaining property owner's driveway culverts was determined to have insufficient capacity for a 25-year storm event" ;
proeth:usedby "City C, property owners, ethical review of Firm BWJ's design adequacy" ;
proeth:usedincontext "Third-party independent engineering review commissioned by City C following flooding complaints, using hydrological modeling to assess whether BWJ's design met the 25-year recurrence interval standard. Findings revealed substantially larger post-development runoff flows and insufficient culvert capacity." ;
proeth:version "Post-construction review" ;
proeth:wasattributedto "Case 11 Extraction" ;
prov:generatedAtTime "2026-02-24T20:54:41.749005"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Extraction details
Discovered in case
11
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-24T20:35:16.956825+00:00
First case
11
Generated
2026-02-24T20:35:16.956825+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.749005
Generated by
ProEthica Case 11 Extraction