Engineer R Post-Project Harm Materialized

S · State Individual
http://proethica.org/ontology/case/11#Engineer_R_Post-Project_Harm_Materialized
Properties
Instance of
Post-ProjectHarmMaterializedState
http://proethica.org/ontology/intermediate#Post-ProjectHarmMaterializedState
Active period
From completion of subdivision construction through the present, as flooding damage has been documented and independent analysis confirms regulatory exceedance
Affected parties
Adjacent property owners
City C
Firm BWJ
Firm IBM
Principal Engineer R
Confidence
0.92
Importance
high
Subject
Principal Engineer R's subdivision stormwater design and resulting flooding of adjacent properties
Terminated by
Not yet terminated — pending acknowledgment, risk management engagement, and corrective design implementation
Triggering event
Adjacent property flooding following subdivision construction, combined with IBM's independent modeling confirming post-development runoff exceeds pre-development conditions
Urgency level
high
Source Evidence
Source text
Prior to construction, adjacent property has not flooded

Text references
Prior to construction, adjacent property has not flooded
an independent analysis of the design seems to show stormwater runoff flows are larger after construction
both actual flood damage and IBM's modeling suggests that the subdivision design failed to comply with City C's regulatory requirement
TTL
@prefix case11: <http://proethica.org/ontology/case/11#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case11:Engineer_R_Post-Project_Harm_Materialized a proeth:Post-ProjectHarmMaterializedState, owl:NamedIndividual ; rdfs:label "Engineer R Post-Project Harm Materialized" ; proeth:activeperiod "From completion of subdivision construction through the present, as flooding damage has been documented and independent analysis confirms regulatory exceedance" ; proeth:affectedparties "Adjacent property owners", "City C", "Firm BWJ", "Firm IBM", "Principal Engineer R" ; proeth:conceptCategory "State" ; proeth:confidence "0.92" ; proeth:discoveredincase "11" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-24T20:36:41.701431+00:00" ; proeth:firstdiscoveredincase "11" ; proeth:generatedattime "2026-02-24T20:36:41.701431+00:00" ; proeth:importance "high" ; proeth:sourcetext "Prior to construction, adjacent property has not flooded" ; proeth:stateclass "Post-Project Harm Materialized State" ; proeth:subject "Principal Engineer R's subdivision stormwater design and resulting flooding of adjacent properties" ; proeth:terminatedby "Not yet terminated — pending acknowledgment, risk management engagement, and corrective design implementation" ; proeth:textreferences "Prior to construction, adjacent property has not flooded", "an independent analysis of the design seems to show stormwater runoff flows are larger after construction", "both actual flood damage and IBM's modeling suggests that the subdivision design failed to comply with City C's regulatory requirement" ; proeth:triggeringevent "Adjacent property flooding following subdivision construction, combined with IBM's independent modeling confirming post-development runoff exceeds pre-development conditions" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 11 Extraction" ; prov:generatedAtTime "2026-02-24T20:54:41.753772"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 11 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
11
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-24T20:36:41.701431+00:00
First case
11
Generated
2026-02-24T20:36:41.701431+00:00
Attributed to
Case 11 Extraction
Generated
2026-02-24T20:54:41.753772
Generated by
ProEthica Case 11 Extraction