Professional-Report-Integrity-Standard

Rs · Resource Individual
http://proethica.org/ontology/case/100#Professional-Report-Integrity-Standard
Properties
Instance of
ProfessionalReportIntegrityStandard
http://proethica.org/ontology/intermediate#ProfessionalReportIntegrityStandard
Confidence
0.9
Created by
Professional engineering ethics norms
Document title
Professional Report Integrity Standard
Importance
high
Used by
Engineer A when deciding to exclude the wall defect observation from the final report
Used in context
Governs whether Engineer A's omission of the wall defect from his final engineering report — at client request — constitutes a violation of the prohibition on selective omission of material facts from professional engineering reports.
Source Evidence
Source text
Engineer A states that he will retain the information from his engineering notes but not include it in the final report, as requested

Text references
Engineer A states that he will retain the information from his engineering notes but not include it in the final report, as requested
Engineer A surmises that the defective condition may have been a contributing factor in the wall failure and notes this in his engineering notes
TTL
@prefix case100: <http://proethica.org/ontology/case/100#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case100:Professional-Report-Integrity-Standard a proeth:ProfessionalReportIntegrityStandard, owl:NamedIndividual ; rdfs:label "Professional-Report-Integrity-Standard" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.9" ; proeth:createdby "Professional engineering ethics norms" ; proeth:discoveredincase "100" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:documenttitle "Professional Report Integrity Standard" ; proeth:firstdiscoveredat "2026-03-01T08:21:46.983063+00:00" ; proeth:firstdiscoveredincase "100" ; proeth:generatedattime "2026-03-01T08:21:46.983063+00:00" ; proeth:importance "high" ; proeth:resourceclass "Professional Report Integrity Standard" ; proeth:sourcetext "Engineer A states that he will retain the information from his engineering notes but not include it in the final report, as requested" ; proeth:textreferences "Engineer A states that he will retain the information from his engineering notes but not include it in the final report, as requested", "Engineer A surmises that the defective condition may have been a contributing factor in the wall failure and notes this in his engineering notes" ; proeth:usedby "Engineer A when deciding to exclude the wall defect observation from the final report" ; proeth:usedincontext "Governs whether Engineer A's omission of the wall defect from his final engineering report — at client request — constitutes a violation of the prohibition on selective omission of material facts from professional engineering reports." ; proeth:wasattributedto "Case 100 Extraction" ; prov:generatedAtTime "2026-03-01T08:48:56.171345"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 100 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
100
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T08:21:46.983063+00:00
First case
100
Generated
2026-03-01T08:21:46.983063+00:00
Attributed to
Case 100 Extraction
Generated
2026-03-01T08:48:56.171345
Generated by
ProEthica Case 100 Extraction