Engineer A Selective Omission in Final Bridge Inspection Report
S · State
Individual
http://proethica.org/ontology/case/100#Engineer_A_Selective_Omission_in_Final_Bridge_Inspection_Report
Properties
Instance of
SelectiveInformationOmissioninProfessionalReportState
http://proethica.org/ontology/intermediate#SelectiveInformationOmissioninProfessionalReportState
Active period
From the point of agreeing to omit the finding through submission of the final report
Affected parties
Engineer A
Future users of the bridge inspection report
Public Agency
VWX Architects and Engineers
Confidence
0.91
Importance
high
Subject
Engineer A's final report omitting the wall defect finding at client direction, despite its potential safety relevance
Terminated by
Submission of final report without the finding
Triggering event
Engineer A agrees to exclude wall defect information from final report as requested by VWX/public agency
Urgency level
high
Source Evidence
Source text
Engineer A states that he will retain the information from his engineering notes but not include it in the final report, as requested.
Text references
Engineer A does not report this information to any other public agency or authority.
Engineer A states that he will retain the information from his engineering notes but not include it in the final report, as requested.
TTL
@prefix case100: <http://proethica.org/ontology/case/100#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case100:Engineer_A_Selective_Omission_in_Final_Bridge_Inspection_Report a proeth:SelectiveInformationOmissioninProfessionalReportState,
owl:NamedIndividual ;
rdfs:label "Engineer A Selective Omission in Final Bridge Inspection Report" ;
proeth:activeperiod "From the point of agreeing to omit the finding through submission of the final report" ;
proeth:affectedparties "Engineer A",
"Future users of the bridge inspection report",
"Public Agency",
"VWX Architects and Engineers" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.91" ;
proeth:discoveredincase "100" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-03-01T08:22:25.556503+00:00" ;
proeth:firstdiscoveredincase "100" ;
proeth:generatedattime "2026-03-01T08:22:25.556503+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "Engineer A states that he will retain the information from his engineering notes but not include it in the final report, as requested." ;
proeth:stateclass "Selective Information Omission in Professional Report State" ;
proeth:subject "Engineer A's final report omitting the wall defect finding at client direction, despite its potential safety relevance" ;
proeth:terminatedby "Submission of final report without the finding" ;
proeth:textreferences "Engineer A does not report this information to any other public agency or authority.",
"Engineer A states that he will retain the information from his engineering notes but not include it in the final report, as requested." ;
proeth:triggeringevent "Engineer A agrees to exclude wall defect information from final report as requested by VWX/public agency" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 100 Extraction" ;
prov:generatedAtTime "2026-03-01T08:48:56.176159"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 100 Extraction" .
Metadata
Extraction details
Discovered in case
100
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T08:22:25.556503+00:00
First case
100
Generated
2026-03-01T08:22:25.556503+00:00
Attributed to
Case 100 Extraction
Generated
2026-03-01T08:48:56.176159
Generated by
ProEthica Case 100 Extraction